Beginner-Friendly Tutorials Jul 13, 2026

Your First Monday Post-Fest Debrief Facilitator Card From Sunday Closeout Annex in One Evening - 2026

2026 beginner tutorial—Monday post-fest debrief facilitator card from Sunday closeout jsonl_annex, D1–D6 gates, post_fest_debrief_facilitator_receipt_v1.json, BUILD_RECEIPT post_fest_debrief_card_ok.

By GamineAI Team

Your First Monday Post-Fest Debrief Facilitator Card From Sunday Closeout Annex in One Evening - 2026

Pixel-art hero for Monday post-fest debrief facilitator card from Sunday closeout annex one evening 2026

Monday 9:00 a.m., March 2027: the producer opens Zoom with twelve slides titled “February fest learnings.” Slide three says “strong wishlist hour-one.” Slide seven promises “pager discipline held.” A partner asks: “Where is the jq hourly jsonl for D5 afternoon?” Silence. february_fest_closeout_receipt_v1.json filed Sunday with post_fest_debrief_allowed: true—but nobody converted jsonl_annex[] into a printable facilitator card with paths, booleans, and one-line evidence hooks facilitators can read without opening release-evidence/ mid-call.

March 2027 post-February fest debrief sprint punishes teams that treat Sunday closeout as “done because C1–C10 passed.” Closeout indexes annex paths; Monday debrief needs a human-readable card—who owns funnel narrative, who owns refund jsonl, which HOTFIX integer matches exceptions[].length, and which annex rows are RED before feature work resumes. Hour-one funnel CSV and refund daily log are quantitative cousins; this evening produces the facilitator-facing artifact partners actually open on Monday.

This Tutorials & Beginner-First pipeline converts Sunday closeout jsonl_annex[] into post_fest_debrief_facilitator_card.md, files post_fest_debrief_facilitator_receipt_v1.json with gates D1–D6, and sets BUILD_RECEIPT post_fest_debrief_card_ok: true only when annex paths resolve on disk.

Non-repetition note: Sunday closeout owns C1–C10 root diff + annex index. Friday November capstone owns pre-freeze latch. Monday January reconciliation owns cross-era upload gate. Partner-review case study (March cluster #5 — published) owns empty annex recovery. This URL owns one-evening printable card + facilitator receipt from non-empty Sunday annex—evidence presentation, not closeout mechanics.

Pair Sunday closeout #11, hour-one funnel #2, Guide #43 forward, Course 281 forward, forward blog #4 March evidence sprint challenge.

Why this matters now (March 2027 Monday debrief)

  1. Narrative without paths — Partners hear adjectives; diligence wants file paths + sha256 beside each claim.
  2. Sunday ≠ Monday-readypost_fest_debrief_allowed proves closeout ran; post_fest_debrief_card_ok proves facilitators can run the call from one printed page.
  3. Feature sprint collision — March stand-ups reward new work; Monday debrief without a card becomes opinion theater—same failure mode Sunday closeout prevented for root BUILD_RECEIPT.
  4. Annex path drift — Engineers move release-evidence/ folders Monday AM; card must snapshot Sunday night paths with annex_index_sha256.
  5. Course 281 milestone — Forward lesson expects facilitator receipt beside february_fest_closeout_receipt_v1.json before post-fest narrative ships.

Direct answer: After Sunday closeout C1–C10 GREEN, spend one evening extracting jsonl_annex[], building post_fest_debrief_facilitator_card.md, validating paths with jq + test -f, filing post_fest_debrief_facilitator_receipt_v1.json, and setting post_fest_debrief_card_ok: true on BUILD_RECEIPT when D1–D6 pass.

What you will finish tonight

Audience Outcome
Beginner One printable facilitator card with annex row owners
Solo founder Monday debrief script without opening twelve folders
Producer Partner call with path receipts beside each bullet
Working dev post_fest_debrief_facilitator_receipt_v1.json + verify script

Time: 60–75 minutes first March debrief; 20 minutes when Sunday annex template is pinned.
Prerequisites: Sunday closeout GREEN (february_fest_closeout_ok, post_fest_debrief_allowed), february_fest_closeout_receipt_v1.json on disk, jq installed.

Beginner path — facilitator card sections

Create release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md with five blocks (print or PDF):

Block A — Call metadata

Field Example
fest_window 2027-02-next-fest-live
debrief_date 2027-03-02 (Monday)
build_label fest-demo-2027-02-rc1
facilitator producer@studio
partner_attendees Named list

Block B — Quantitative annex rows (from Sunday index)

Annex key Owner One-line hook Path (Sunday snapshot)
hour_one_funnel_csv Analytics D7 hour_one_quit_rate release-evidence/analytics/hour-one-funnel-2027.csv
refund_daily_jsonl Producer D7 refund_pct vs threshold release-evidence/february-live/refund/february_refund_spike_daily_log.jsonl
hourly_ops_jsonl Release Last D7 hour GREEN release-evidence/february-live/ops/february_fest_live_ops_hourly_log.jsonl
hotfix_exception_list Release exceptions[].length match release-evidence/february-live/hotfix/hotfix_exception_list_receipt_v1.json
pager_challenge_receipt Pager lead P5 sign-off path release-evidence/february-live/pager/february_live_ops_challenge_receipt_v1.json

Beginner rule: Every row needs owner + path—no “we discussed funnel” without file.

Block C — Boolean latch table (read from BUILD_RECEIPT)

Copy root booleans Sunday closeout latched—facilitator reads aloud Y/N:

february_live_timebox_ok, hour_one_funnel_snapshot_ok, fest_live_moderation_ok, february_live_ops_challenge_ok, refund_spike_watch_ok, hotfix_exception_list_ok, february_fest_closeout_ok.

Block D — RED/YELLOW/GREEN routing

Band Monday debrief policy
GREEN State metric + point to annex path; no feature promises
YELLOW Name owner + date for follow-up; log in card notes[]
RED No March sprint promotion until receipt filed; pair blog #5 if annex empty

Block E — Sign-off

Facilitator initials + UTC timestamp when call ends; path to filed post_fest_debrief_facilitator_receipt_v1.json.

Developer path — gates D1–D6

Gate Check Pass when
D1 Sunday closeout cousin GREEN post_fest_debrief_allowed: true
D2 Annex index extracted annex_index.json matches closeout jsonl_annex[]
D3 All annex paths exist test -f or jq path walk exits 0
D4 Facilitator card generated post_fest_debrief_facilitator_card.md ≥5 blocks
D5 Card sha256 pinned Hash in receipt matches export
D6 Receipt + BUILD_RECEIPT post_fest_debrief_card_ok: true

D1 — latch Sunday closeout

jq -e '.post_fest_debrief_allowed == true' release-evidence/BUILD_RECEIPT.json
jq -e '.february_fest_closeout_ok == true' release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json

Fail: run Sunday C1–C10 before Monday card work—do not fabricate annex rows.

D2 — extract annex index from closeout receipt

jq '.jsonl_annex' release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json \
  > release-evidence/post-fest/debrief/annex_index.json

Expected shape:

[
  {
    "key": "hour_one_funnel_csv",
    "path": "release-evidence/analytics/hour-one-funnel-2027.csv",
    "source_receipt": "hour_one_funnel_snapshot_receipt_v1",
    "fest_day": "D7"
  },
  {
    "key": "refund_daily_jsonl",
    "path": "release-evidence/february-live/refund/february_refund_spike_daily_log.jsonl",
    "source_receipt": "february_refund_spike_receipt_v1",
    "fest_day": "D7"
  }
]

D3 — path existence walk

#!/usr/bin/env bash
set -euo pipefail
INDEX="${1:-release-evidence/post-fest/debrief/annex_index.json}"
while IFS= read -r path; do
  test -f "$path" || { echo "MISSING: $path"; exit 1; }
done < <(jq -r '.[].path' "$INDEX")
echo "annex paths: OK"

Fail-closed: missing path → RED Monday debrief; do not present slide deck until D3 GREEN or waiver documented.

D4 — generate card from template

Pin scripts/render_debrief_facilitator_card.sh (sketch):

#!/usr/bin/env bash
set -euo pipefail
INDEX="release-evidence/post-fest/debrief/annex_index.json"
OUT="release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md"
BUILD="release-evidence/BUILD_RECEIPT.json"
{
  echo "# Post-Fest Debrief Facilitator Card"
  echo ""
  echo "**fest_window:** $(jq -r '.fest_window // "2027-02-next-fest-live"' release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json)"
  echo "**build_label:** $(jq -r '.build_label' "$BUILD")"
  echo ""
  echo "## Annex evidence rows"
  jq -r '.[] | "- **\(.key)** — `\(.path)` — \(.source_receipt)"' "$INDEX"
} > "$OUT"

Human edit Block C booleans and Block D routing after script—automation owns paths only.

D5 — card hash

sha256sum release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md

Store digest in receipt facilitator_card_sha256.

D6 — post_fest_debrief_facilitator_receipt_v1.json

{
  "schema": "post_fest_debrief_facilitator_receipt_v1",
  "fest_window": "2027-02-next-fest-live",
  "debrief_scheduled_utc": "2027-03-02T14:00:00Z",
  "build_label": "fest-demo-2027-02-rc1",
  "cousin_receipts": {
    "february_fest_closeout": "release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json",
    "hour_one_funnel": "release-evidence/analytics/HOUR_ONE_FUNNEL_SNAPSHOT_RECEIPT.json"
  },
  "annex_index_path": "release-evidence/post-fest/debrief/annex_index.json",
  "annex_index_sha256": "a1b2c3…",
  "facilitator_card_path": "release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md",
  "facilitator_card_sha256": "d4e5f6…",
  "gates": {
    "D1_closeout_cousin": "pass",
    "D2_annex_index": "pass",
    "D3_paths_exist": "pass",
    "D4_card_generated": "pass",
    "D5_card_hash": "pass",
    "D6_receipt": "pass"
  },
  "post_fest_debrief_card_ok": true,
  "march_sprint_planning_allowed": true
}

Pin at release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json.

verify_post_fest_debrief_facilitator.sh

#!/usr/bin/env bash
set -euo pipefail
REC="${1:-release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json}"
jq -e '.schema == "post_fest_debrief_facilitator_receipt_v1"' "$REC" || exit 1
jq -e '.post_fest_debrief_card_ok == true' "$REC" || exit 6
jq -e '.cousin_receipts.february_fest_closeout' "$REC" >/dev/null || exit 2
while IFS= read -r path; do test -f "$path" || exit 3; done < <(jq -r '.[].path' "$(jq -r '.annex_index_path' "$REC")")
echo "post_fest_debrief_facilitator verify: OK"

BUILD_RECEIPT columns

Column Example
post_fest_debrief_card_ok true
post_fest_debrief_facilitator_receipt release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json
march_sprint_planning_allowed true

Add only after D6 GREEN—distinct from Sunday’s post_fest_debrief_allowed.

Monday debrief stand-up script (15 minutes)

  1. Open Block A — confirm attendees + build_label.
  2. Block C booleans — facilitator reads Y/N; partner may ask for annex on any N.
  3. Block B paths — one minute per annex row; show file timestamp if challenged.
  4. Block D routing — assign YELLOW owners before discussing March features.
  5. Block E sign-off — file receipt before ending call.

Red flag: Partner asks for path not on card → add row, re-run D3, bump annex_index_sha256, reschedule if RED.

Proof table

Row Evidence GREEN when
P1 Sunday closeout receipt D1 post_fest_debrief_allowed
P2 annex_index.json D2 matches jsonl_annex[]
P3 Path walk log D3 exit 0
P4 post_fest_debrief_facilitator_card.md D4 five blocks present
P5 sha256 row D5 matches card file
P6 BUILD_RECEIPT post_fest_debrief_card_ok true

Scenarios A–G

ID Situation Lane
A Sunday GREEN, one annex missing Monday D3 fail—re-export or waiver
B Empty jsonl_annex[] Sunday Pair blog #5 recovery—do not fake card
C Partner wants only narrative Block B paths mandatory—D4 policy
D HOTFIX count drift Re-open HOTFIX opinion before debrief
E Funnel CSV column rename Hour-one funnel F2 + Help #37 forward
F Card hash mismatch after edit Re-run D5 before call
G March sprint starts without D6 Block march_sprint_planning_allowed on BUILD_RECEIPT

Relationship to Sunday closeout vs March cluster

Artifact Role
Sunday closeout C1–C10 Root diff + jsonl_annex[] index
This tutorial Printable card + facilitator receipt
7-day March evidence challenge (forward #4) Nightly sprint discipline after debrief
Guide #43 forward Ninety-second annex → card export preflight
Course 281 forward BUILD_RECEIPT milestone wiring

Order: Sunday closeout → this evening (D1–D6) → Monday debrief call → March evidence sprint.

Annex row catalog (what Monday card must index)

Store once in release-evidence/post-fest/debrief/annex-row-catalog.md—extend when cluster receipts ship:

Annex key Source cluster Required? Facilitator hook
hour_one_funnel_csv Blog #2 funnel Yes D7 hour_one_quit_rate + launch_rate
refund_daily_jsonl Blog #9 refund Yes Last line refund_pct vs threshold
hourly_ops_jsonl Blog #8 jq hourly Yes wc -l + last hour GREEN
hotfix_exception_list Blog #10 HOTFIX Yes exceptions[].length == root count
pager_challenge_receipt Blog #4 pager Yes P5 sign-off path
fest_live_moderation_roster Blog #3 moderation If adopted Exported roster CSV
fest_stream_overlay_receipt Blog #7 overlay If adopted O6 re-run after HOTFIX
february_live_queue_receipt Blog #6 queue If adopted Q6 wall-clock path
whisper_clips_index Blog #12 Whisper Optional Same-day P0 clip paths
timebox_actuals_csv Blog #1 timebox Yes D7 actuals vs planned lanes

Developer rule: annex_index.json keys must be a subset of Sunday closeout jsonl_annex[]—never invent paths Monday morning without closeout receipt_version bump.

Full annex_index.json example (synthetic D7)

[
  {
    "key": "hour_one_funnel_csv",
    "path": "release-evidence/analytics/hour-one-funnel-2027.csv",
    "source_receipt": "hour_one_funnel_snapshot_receipt_v1",
    "fest_day": "D7",
    "owner": "analytics@studio",
    "hook": "hour_one_quit_rate 0.312 launch_rate 0.241"
  },
  {
    "key": "refund_daily_jsonl",
    "path": "release-evidence/february-live/refund/february_refund_spike_daily_log.jsonl",
    "source_receipt": "february_refund_spike_receipt_v1",
    "fest_day": "D7",
    "owner": "producer@studio",
    "hook": "refund_pct 1.8% below 2.5% threshold"
  },
  {
    "key": "hourly_ops_jsonl",
    "path": "release-evidence/february-live/ops/february_fest_live_ops_hourly_log.jsonl",
    "source_receipt": "february_fest_live_ops_receipt_v1",
    "fest_day": "D7",
    "owner": "release@studio",
    "hook": "168 lines; last hour J6 GREEN"
  },
  {
    "key": "hotfix_exception_list",
    "path": "release-evidence/february-live/hotfix/hotfix_exception_list_receipt_v1.json",
    "source_receipt": "hotfix_exception_list_receipt_v1",
    "fest_day": "D7",
    "owner": "release@studio",
    "hook": "2 exceptions; count matches BUILD_RECEIPT"
  },
  {
    "key": "pager_challenge_receipt",
    "path": "release-evidence/february-live/pager/february_live_ops_challenge_receipt_v1.json",
    "source_receipt": "february_live_ops_challenge_receipt_v1",
    "fest_day": "D7",
    "owner": "pager@studio",
    "hook": "P5 sign-off 2027-02-28T22:10:00Z"
  },
  {
    "key": "timebox_actuals_csv",
    "path": "release-evidence/february-live/timebox/february-live-actuals-2027.csv",
    "source_receipt": "february_live_timebox_receipt_v1",
    "fest_day": "D7",
    "owner": "founder@studio",
    "hook": "pager lane 11.2h vs 12h cap"
  }
]

Worked example — printable card excerpt

After render_debrief_facilitator_card.sh + human edit:

# Post-Fest Debrief Facilitator Card — 2027-03-02

**fest_window:** 2027-02-next-fest-live  
**build_label:** fest-demo-2027-02-rc1  
**facilitator:** producer@studio  
**partner:** diligence@publisher

## Boolean latch (read aloud)

| Key | Value |
|-----|-------|
| february_fest_closeout_ok | true |
| hour_one_funnel_snapshot_ok | true |
| refund_spike_watch_ok | true |
| hotfix_exception_list_ok | true |
| february_live_ops_challenge_ok | true |

## Annex evidence (path + hook)

1. **hour_one_funnel_csv** — `release-evidence/analytics/hour-one-funnel-2027.csv` — D7 quit 0.312  
2. **refund_daily_jsonl** — `.../february_refund_spike_daily_log.jsonl` — 1.8% vs 2.5% cap  
3. **hourly_ops_jsonl** — `.../february_fest_live_ops_hourly_log.jsonl` — 168 lines, gap waived D5  
4. **hotfix_exception_list** — `.../hotfix_exception_list_receipt_v1.json` — HOTFIX-001, HOTFIX-002  
5. **pager_challenge_receipt** — `.../february_live_ops_challenge_receipt_v1.json` — P5 GREEN  

## YELLOW follow-ups

- D5 hourly gap: waiver in closeout notes — owner release@studio by 2027-03-04  

## Sign-off

Facilitator: ______  UTC: 2027-03-02T14:45:00Z  
Receipt: `release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json`

Partners screenshot paths, not slides—card is the diligence index.

Partner diligence zip (Monday invite attachment)

When D6 GREEN, zip before calendar send:

#!/usr/bin/env bash
set -euo pipefail
OUT="release-evidence/post-fest/debrief/partner-debrief-2027-03-02.zip"
zip -j "$OUT" \
  release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json \
  release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json \
  release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md \
  release-evidence/post-fest/debrief/annex_index.json
# Add annex files (paths from index)
while IFS= read -r p; do zip -u "$OUT" "$p"; done < <(jq -r '.[].path' release-evidence/post-fest/debrief/annex_index.json)
echo "partner zip: $OUT"

Beginner tip: Name zip with UTC date + build_label—partners file hundreds of fest folders.

PowerShell verify cousin

$rec = Get-Content "release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json" | ConvertFrom-Json
if ($rec.schema -ne "post_fest_debrief_facilitator_receipt_v1") { exit 1 }
if (-not $rec.post_fest_debrief_card_ok) { exit 6 }
$index = Get-Content $rec.annex_index_path | ConvertFrom-Json
foreach ($row in $index) {
  if (-not (Test-Path $row.path)) { Write-Error "MISSING: $($row.path)"; exit 3 }
}
Write-Host "post_fest_debrief_facilitator verify: OK"

CI hook before March sprint branch merge

# .github/workflows/post-fest-debrief-card.yml (sketch)
jobs:
  debrief-card:
    if: github.ref == 'refs/heads/march-sprint-2027'
    runs-on: ubuntu-latest
    steps:
      - uses: actions/checkout@v4
      - name: Verify facilitator receipt
        run: bash scripts/verify_post_fest_debrief_facilitator.sh
      - name: Assert BUILD_RECEIPT latch
        run: jq -e '.post_fest_debrief_card_ok == true' release-evidence/BUILD_RECEIPT.json

Fail-closed: merge blocked when Sunday closeout cousin missing or annex path deleted in rebase.

Comparison pack (card vs cousin artifacts)

Artifact Owns Audience
Sunday closeout C1–C10 root diff + jsonl_annex[] Release owner
Monday facilitator card Printable paths + hooks Partner call
7-day March evidence sprint (forward #4) Nightly E1–E7 receipts Engineering sprint
Partner empty annex case study (#5) Recovery when annex empty Diligence failure

FACILITATOR_DEFINITION.md starter

# Monday post-fest debrief facilitator definition — March 2027

- **Call length:** 30–45 minutes; hard stop at 45.
- **Required attendees:** Producer (facilitator), release owner, partner diligence.
- **Evidence rule:** Every quantitative claim cites annex path on card Block B.
- **Feature discussion:** Deferred until Block C booleans read and YELLOW owners assigned.
- **Recording:** Optional; receipt + card sha256 are source of truth—not meeting notes.
- **Owner:** Producer signs before first March debrief; changes bump `receipt_version`.

BUILD_RECEIPT row catalog extension

Add after Sunday closeout columns:

Column Example Set when
post_fest_debrief_card_ok true D6 GREEN
post_fest_debrief_facilitator_receipt release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json D6
facilitator_card_sha256 d4e5f6… D5
march_sprint_planning_allowed true After debrief sign-off or waiver

Never set march_sprint_planning_allowed when post_fest_debrief_card_ok false—distinct from Sunday post_fest_debrief_allowed.

Extended scenarios H–L

H — Partner requests jq proof mid-call
Open hourly_ops_jsonl path from card; run tail -1 + jq hourly J6 gate sketch—do not improvise from memory.

I — Facilitator card edited after D5 hash
Re-run sha256 + update receipt facilitator_card_sha256 before sending partner zip.

J — Two annex rows same source receipt
Allowed when paths differ (e.g. raw export + normalized CSV)—document both in index with distinct key.

K — March sprint branch opened Sunday night
CI debrief-card job should fail until D6 receipt lands Monday evening—block promotion theater.

L — Publisher asks for October prep in same call
Park October RC label evening (blog #2 forward) to separate invite—Monday card scope is February evidence only.

Facilitator timing map (Sunday night → Monday call)

When Action Gate
Sunday 22:15 Sunday closeout complete C1–C10
Sunday 22:30 Export annex_index.json from closeout D2
Monday 08:00 Path walk + card render D3–D4
Monday 08:30 Hash + receipt + BUILD_RECEIPT D5–D6
Monday 09:00 Partner zip + calendar Invite
Monday 14:00 Facilitated call with card Block E sign-off

Common mistakes

  • Scheduling Monday debrief before Sunday C1–C10 completes (D1).
  • Slides without paths—partners cannot diligence narrative (D4).
  • Copying annex paths from memory—always export from closeout JSON (D2).
  • Setting post_fest_debrief_card_ok when one annex file missing (D3).
  • Merging facilitator receipt into closeout receipt—cousin link only (D6).
  • Skipping hour-one funnel row on card when D7 CSV exists.

Troubleshooting

Symptom Fix
post_fest_debrief_allowed false Complete Sunday closeout
jq empty jsonl_annex Closeout C7 fail—re-run Sunday
Path missing on disk Restore from git tag or re-file source receipt
Partner rejects card format Export PDF; keep sha256 of source .md
Boolean table disagrees with annex Re-diff BUILD_RECEIPT root row

Key takeaways

  1. Sunday closeout indexes; Monday card presents—different artifacts (D2 vs D4).
  2. post_fest_debrief_card_ok is distinct from post_fest_debrief_allowed.
  3. Every annex row needs owner + path + one-line hook on the printable card.
  4. D3 path walk is fail-closed—no Monday debrief theater on missing files.
  5. Hour-one funnel and refund jsonl are typical Block B rows.
  6. verify_post_fest_debrief_facilitator.sh gives CI one exit code before March sprint branches merge.
  7. 7-day March evidence sprint (#4 published) consumes debrief outcomes into nightly E1–E7 receipts.
  8. Guide #43 forward owns ninety-second export preflight cousin.
  9. Course 281 forward wires closeout + facilitator receipts on BUILD_RECEIPT.
  10. Pair BUILD_RECEIPT beginner pipeline for root row discipline.
  11. Empty annex → partner-review case study (#5 forward), not this tutorial.
  12. March cluster #1 opens #2–#12 sprint runway—file facilitator receipt before October prep evenings.

FAQ

Is this replacing Sunday closeout?
No—Sunday owns C1–C10; this tutorial owns D1–D6 facilitator card from Sunday’s jsonl_annex[].

Can we debrief without a printed card?
You can—but partners lose path receipts; post_fest_debrief_card_ok requires D4 card file on disk.

Same receipt as closeout?
No—post_fest_debrief_facilitator_receipt_v1 references february_fest_closeout_receipt_v1 in cousin_receipts only.

What if annex has optional rows?
Document waivers in notes[]; D3 may use conditional walk with required: false in annex index schema extension.

Does this cover Whisper handoff?
Post-fest Whisper batch is blog #12 forward—add clips_index annex row when February same-day triage filed.

How does this relate to Thursday row review?
Thursday ritual is weekly promotion diff; Monday debrief is post-fest narrative with annex paths.

Related GamineAI reads


Partners remember paths, not adjectives—export Sunday jsonl_annex[], print the facilitator card, file post_fest_debrief_facilitator_receipt_v1.json, then hold Monday debrief.