Your First Monday Post-Fest Debrief Facilitator Card From Sunday Closeout Annex in One Evening - 2026

Monday 9:00 a.m., March 2027: the producer opens Zoom with twelve slides titled “February fest learnings.” Slide three says “strong wishlist hour-one.” Slide seven promises “pager discipline held.” A partner asks: “Where is the jq hourly jsonl for D5 afternoon?” Silence. february_fest_closeout_receipt_v1.json filed Sunday with post_fest_debrief_allowed: true—but nobody converted jsonl_annex[] into a printable facilitator card with paths, booleans, and one-line evidence hooks facilitators can read without opening release-evidence/ mid-call.
March 2027 post-February fest debrief sprint punishes teams that treat Sunday closeout as “done because C1–C10 passed.” Closeout indexes annex paths; Monday debrief needs a human-readable card—who owns funnel narrative, who owns refund jsonl, which HOTFIX integer matches exceptions[].length, and which annex rows are RED before feature work resumes. Hour-one funnel CSV and refund daily log are quantitative cousins; this evening produces the facilitator-facing artifact partners actually open on Monday.
This Tutorials & Beginner-First pipeline converts Sunday closeout jsonl_annex[] into post_fest_debrief_facilitator_card.md, files post_fest_debrief_facilitator_receipt_v1.json with gates D1–D6, and sets BUILD_RECEIPT post_fest_debrief_card_ok: true only when annex paths resolve on disk.
Non-repetition note: Sunday closeout owns C1–C10 root diff + annex index. Friday November capstone owns pre-freeze latch. Monday January reconciliation owns cross-era upload gate. Partner-review case study (March cluster #5 — published) owns empty annex recovery. This URL owns one-evening printable card + facilitator receipt from non-empty Sunday annex—evidence presentation, not closeout mechanics.
Pair Sunday closeout #11, hour-one funnel #2, Guide #43 forward, Course 281 forward, forward blog #4 March evidence sprint challenge.
Why this matters now (March 2027 Monday debrief)
- Narrative without paths — Partners hear adjectives; diligence wants file paths + sha256 beside each claim.
- Sunday ≠ Monday-ready —
post_fest_debrief_allowedproves closeout ran;post_fest_debrief_card_okproves facilitators can run the call from one printed page. - Feature sprint collision — March stand-ups reward new work; Monday debrief without a card becomes opinion theater—same failure mode Sunday closeout prevented for root BUILD_RECEIPT.
- Annex path drift — Engineers move
release-evidence/folders Monday AM; card must snapshot Sunday night paths withannex_index_sha256. - Course 281 milestone — Forward lesson expects facilitator receipt beside
february_fest_closeout_receipt_v1.jsonbefore post-fest narrative ships.
Direct answer: After Sunday closeout C1–C10 GREEN, spend one evening extracting jsonl_annex[], building post_fest_debrief_facilitator_card.md, validating paths with jq + test -f, filing post_fest_debrief_facilitator_receipt_v1.json, and setting post_fest_debrief_card_ok: true on BUILD_RECEIPT when D1–D6 pass.
What you will finish tonight
| Audience | Outcome |
|---|---|
| Beginner | One printable facilitator card with annex row owners |
| Solo founder | Monday debrief script without opening twelve folders |
| Producer | Partner call with path receipts beside each bullet |
| Working dev | post_fest_debrief_facilitator_receipt_v1.json + verify script |
Time: 60–75 minutes first March debrief; 20 minutes when Sunday annex template is pinned.
Prerequisites: Sunday closeout GREEN (february_fest_closeout_ok, post_fest_debrief_allowed), february_fest_closeout_receipt_v1.json on disk, jq installed.
Beginner path — facilitator card sections
Create release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md with five blocks (print or PDF):
Block A — Call metadata
| Field | Example |
|---|---|
fest_window |
2027-02-next-fest-live |
debrief_date |
2027-03-02 (Monday) |
build_label |
fest-demo-2027-02-rc1 |
facilitator |
producer@studio |
partner_attendees |
Named list |
Block B — Quantitative annex rows (from Sunday index)
| Annex key | Owner | One-line hook | Path (Sunday snapshot) |
|---|---|---|---|
hour_one_funnel_csv |
Analytics | D7 hour_one_quit_rate |
release-evidence/analytics/hour-one-funnel-2027.csv |
refund_daily_jsonl |
Producer | D7 refund_pct vs threshold |
release-evidence/february-live/refund/february_refund_spike_daily_log.jsonl |
hourly_ops_jsonl |
Release | Last D7 hour GREEN | release-evidence/february-live/ops/february_fest_live_ops_hourly_log.jsonl |
hotfix_exception_list |
Release | exceptions[].length match |
release-evidence/february-live/hotfix/hotfix_exception_list_receipt_v1.json |
pager_challenge_receipt |
Pager lead | P5 sign-off path | release-evidence/february-live/pager/february_live_ops_challenge_receipt_v1.json |
Beginner rule: Every row needs owner + path—no “we discussed funnel” without file.
Block C — Boolean latch table (read from BUILD_RECEIPT)
Copy root booleans Sunday closeout latched—facilitator reads aloud Y/N:
february_live_timebox_ok, hour_one_funnel_snapshot_ok, fest_live_moderation_ok, february_live_ops_challenge_ok, refund_spike_watch_ok, hotfix_exception_list_ok, february_fest_closeout_ok.
Block D — RED/YELLOW/GREEN routing
| Band | Monday debrief policy |
|---|---|
| GREEN | State metric + point to annex path; no feature promises |
| YELLOW | Name owner + date for follow-up; log in card notes[] |
| RED | No March sprint promotion until receipt filed; pair blog #5 if annex empty |
Block E — Sign-off
Facilitator initials + UTC timestamp when call ends; path to filed post_fest_debrief_facilitator_receipt_v1.json.
Developer path — gates D1–D6
| Gate | Check | Pass when |
|---|---|---|
| D1 | Sunday closeout cousin GREEN | post_fest_debrief_allowed: true |
| D2 | Annex index extracted | annex_index.json matches closeout jsonl_annex[] |
| D3 | All annex paths exist | test -f or jq path walk exits 0 |
| D4 | Facilitator card generated | post_fest_debrief_facilitator_card.md ≥5 blocks |
| D5 | Card sha256 pinned | Hash in receipt matches export |
| D6 | Receipt + BUILD_RECEIPT | post_fest_debrief_card_ok: true |
D1 — latch Sunday closeout
jq -e '.post_fest_debrief_allowed == true' release-evidence/BUILD_RECEIPT.json
jq -e '.february_fest_closeout_ok == true' release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json
Fail: run Sunday C1–C10 before Monday card work—do not fabricate annex rows.
D2 — extract annex index from closeout receipt
jq '.jsonl_annex' release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json \
> release-evidence/post-fest/debrief/annex_index.json
Expected shape:
[
{
"key": "hour_one_funnel_csv",
"path": "release-evidence/analytics/hour-one-funnel-2027.csv",
"source_receipt": "hour_one_funnel_snapshot_receipt_v1",
"fest_day": "D7"
},
{
"key": "refund_daily_jsonl",
"path": "release-evidence/february-live/refund/february_refund_spike_daily_log.jsonl",
"source_receipt": "february_refund_spike_receipt_v1",
"fest_day": "D7"
}
]
D3 — path existence walk
#!/usr/bin/env bash
set -euo pipefail
INDEX="${1:-release-evidence/post-fest/debrief/annex_index.json}"
while IFS= read -r path; do
test -f "$path" || { echo "MISSING: $path"; exit 1; }
done < <(jq -r '.[].path' "$INDEX")
echo "annex paths: OK"
Fail-closed: missing path → RED Monday debrief; do not present slide deck until D3 GREEN or waiver documented.
D4 — generate card from template
Pin scripts/render_debrief_facilitator_card.sh (sketch):
#!/usr/bin/env bash
set -euo pipefail
INDEX="release-evidence/post-fest/debrief/annex_index.json"
OUT="release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md"
BUILD="release-evidence/BUILD_RECEIPT.json"
{
echo "# Post-Fest Debrief Facilitator Card"
echo ""
echo "**fest_window:** $(jq -r '.fest_window // "2027-02-next-fest-live"' release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json)"
echo "**build_label:** $(jq -r '.build_label' "$BUILD")"
echo ""
echo "## Annex evidence rows"
jq -r '.[] | "- **\(.key)** — `\(.path)` — \(.source_receipt)"' "$INDEX"
} > "$OUT"
Human edit Block C booleans and Block D routing after script—automation owns paths only.
D5 — card hash
sha256sum release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md
Store digest in receipt facilitator_card_sha256.
D6 — post_fest_debrief_facilitator_receipt_v1.json
{
"schema": "post_fest_debrief_facilitator_receipt_v1",
"fest_window": "2027-02-next-fest-live",
"debrief_scheduled_utc": "2027-03-02T14:00:00Z",
"build_label": "fest-demo-2027-02-rc1",
"cousin_receipts": {
"february_fest_closeout": "release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json",
"hour_one_funnel": "release-evidence/analytics/HOUR_ONE_FUNNEL_SNAPSHOT_RECEIPT.json"
},
"annex_index_path": "release-evidence/post-fest/debrief/annex_index.json",
"annex_index_sha256": "a1b2c3…",
"facilitator_card_path": "release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md",
"facilitator_card_sha256": "d4e5f6…",
"gates": {
"D1_closeout_cousin": "pass",
"D2_annex_index": "pass",
"D3_paths_exist": "pass",
"D4_card_generated": "pass",
"D5_card_hash": "pass",
"D6_receipt": "pass"
},
"post_fest_debrief_card_ok": true,
"march_sprint_planning_allowed": true
}
Pin at release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json.
verify_post_fest_debrief_facilitator.sh
#!/usr/bin/env bash
set -euo pipefail
REC="${1:-release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json}"
jq -e '.schema == "post_fest_debrief_facilitator_receipt_v1"' "$REC" || exit 1
jq -e '.post_fest_debrief_card_ok == true' "$REC" || exit 6
jq -e '.cousin_receipts.february_fest_closeout' "$REC" >/dev/null || exit 2
while IFS= read -r path; do test -f "$path" || exit 3; done < <(jq -r '.[].path' "$(jq -r '.annex_index_path' "$REC")")
echo "post_fest_debrief_facilitator verify: OK"
BUILD_RECEIPT columns
| Column | Example |
|---|---|
post_fest_debrief_card_ok |
true |
post_fest_debrief_facilitator_receipt |
release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json |
march_sprint_planning_allowed |
true |
Add only after D6 GREEN—distinct from Sunday’s post_fest_debrief_allowed.
Monday debrief stand-up script (15 minutes)
- Open Block A — confirm attendees +
build_label. - Block C booleans — facilitator reads Y/N; partner may ask for annex on any N.
- Block B paths — one minute per annex row; show file timestamp if challenged.
- Block D routing — assign YELLOW owners before discussing March features.
- Block E sign-off — file receipt before ending call.
Red flag: Partner asks for path not on card → add row, re-run D3, bump annex_index_sha256, reschedule if RED.
Proof table
| Row | Evidence | GREEN when |
|---|---|---|
| P1 | Sunday closeout receipt | D1 post_fest_debrief_allowed |
| P2 | annex_index.json |
D2 matches jsonl_annex[] |
| P3 | Path walk log | D3 exit 0 |
| P4 | post_fest_debrief_facilitator_card.md |
D4 five blocks present |
| P5 | sha256 row | D5 matches card file |
| P6 | BUILD_RECEIPT | post_fest_debrief_card_ok true |
Scenarios A–G
| ID | Situation | Lane |
|---|---|---|
| A | Sunday GREEN, one annex missing Monday | D3 fail—re-export or waiver |
| B | Empty jsonl_annex[] Sunday |
Pair blog #5 recovery—do not fake card |
| C | Partner wants only narrative | Block B paths mandatory—D4 policy |
| D | HOTFIX count drift | Re-open HOTFIX opinion before debrief |
| E | Funnel CSV column rename | Hour-one funnel F2 + Help #37 forward |
| F | Card hash mismatch after edit | Re-run D5 before call |
| G | March sprint starts without D6 | Block march_sprint_planning_allowed on BUILD_RECEIPT |
Relationship to Sunday closeout vs March cluster
| Artifact | Role |
|---|---|
| Sunday closeout C1–C10 | Root diff + jsonl_annex[] index |
| This tutorial | Printable card + facilitator receipt |
| 7-day March evidence challenge (forward #4) | Nightly sprint discipline after debrief |
| Guide #43 forward | Ninety-second annex → card export preflight |
| Course 281 forward | BUILD_RECEIPT milestone wiring |
Order: Sunday closeout → this evening (D1–D6) → Monday debrief call → March evidence sprint.
Annex row catalog (what Monday card must index)
Store once in release-evidence/post-fest/debrief/annex-row-catalog.md—extend when cluster receipts ship:
| Annex key | Source cluster | Required? | Facilitator hook |
|---|---|---|---|
hour_one_funnel_csv |
Blog #2 funnel | Yes | D7 hour_one_quit_rate + launch_rate |
refund_daily_jsonl |
Blog #9 refund | Yes | Last line refund_pct vs threshold |
hourly_ops_jsonl |
Blog #8 jq hourly | Yes | wc -l + last hour GREEN |
hotfix_exception_list |
Blog #10 HOTFIX | Yes | exceptions[].length == root count |
pager_challenge_receipt |
Blog #4 pager | Yes | P5 sign-off path |
fest_live_moderation_roster |
Blog #3 moderation | If adopted | Exported roster CSV |
fest_stream_overlay_receipt |
Blog #7 overlay | If adopted | O6 re-run after HOTFIX |
february_live_queue_receipt |
Blog #6 queue | If adopted | Q6 wall-clock path |
whisper_clips_index |
Blog #12 Whisper | Optional | Same-day P0 clip paths |
timebox_actuals_csv |
Blog #1 timebox | Yes | D7 actuals vs planned lanes |
Developer rule: annex_index.json keys must be a subset of Sunday closeout jsonl_annex[]—never invent paths Monday morning without closeout receipt_version bump.
Full annex_index.json example (synthetic D7)
[
{
"key": "hour_one_funnel_csv",
"path": "release-evidence/analytics/hour-one-funnel-2027.csv",
"source_receipt": "hour_one_funnel_snapshot_receipt_v1",
"fest_day": "D7",
"owner": "analytics@studio",
"hook": "hour_one_quit_rate 0.312 launch_rate 0.241"
},
{
"key": "refund_daily_jsonl",
"path": "release-evidence/february-live/refund/february_refund_spike_daily_log.jsonl",
"source_receipt": "february_refund_spike_receipt_v1",
"fest_day": "D7",
"owner": "producer@studio",
"hook": "refund_pct 1.8% below 2.5% threshold"
},
{
"key": "hourly_ops_jsonl",
"path": "release-evidence/february-live/ops/february_fest_live_ops_hourly_log.jsonl",
"source_receipt": "february_fest_live_ops_receipt_v1",
"fest_day": "D7",
"owner": "release@studio",
"hook": "168 lines; last hour J6 GREEN"
},
{
"key": "hotfix_exception_list",
"path": "release-evidence/february-live/hotfix/hotfix_exception_list_receipt_v1.json",
"source_receipt": "hotfix_exception_list_receipt_v1",
"fest_day": "D7",
"owner": "release@studio",
"hook": "2 exceptions; count matches BUILD_RECEIPT"
},
{
"key": "pager_challenge_receipt",
"path": "release-evidence/february-live/pager/february_live_ops_challenge_receipt_v1.json",
"source_receipt": "february_live_ops_challenge_receipt_v1",
"fest_day": "D7",
"owner": "pager@studio",
"hook": "P5 sign-off 2027-02-28T22:10:00Z"
},
{
"key": "timebox_actuals_csv",
"path": "release-evidence/february-live/timebox/february-live-actuals-2027.csv",
"source_receipt": "february_live_timebox_receipt_v1",
"fest_day": "D7",
"owner": "founder@studio",
"hook": "pager lane 11.2h vs 12h cap"
}
]
Worked example — printable card excerpt
After render_debrief_facilitator_card.sh + human edit:
# Post-Fest Debrief Facilitator Card — 2027-03-02
**fest_window:** 2027-02-next-fest-live
**build_label:** fest-demo-2027-02-rc1
**facilitator:** producer@studio
**partner:** diligence@publisher
## Boolean latch (read aloud)
| Key | Value |
|-----|-------|
| february_fest_closeout_ok | true |
| hour_one_funnel_snapshot_ok | true |
| refund_spike_watch_ok | true |
| hotfix_exception_list_ok | true |
| february_live_ops_challenge_ok | true |
## Annex evidence (path + hook)
1. **hour_one_funnel_csv** — `release-evidence/analytics/hour-one-funnel-2027.csv` — D7 quit 0.312
2. **refund_daily_jsonl** — `.../february_refund_spike_daily_log.jsonl` — 1.8% vs 2.5% cap
3. **hourly_ops_jsonl** — `.../february_fest_live_ops_hourly_log.jsonl` — 168 lines, gap waived D5
4. **hotfix_exception_list** — `.../hotfix_exception_list_receipt_v1.json` — HOTFIX-001, HOTFIX-002
5. **pager_challenge_receipt** — `.../february_live_ops_challenge_receipt_v1.json` — P5 GREEN
## YELLOW follow-ups
- D5 hourly gap: waiver in closeout notes — owner release@studio by 2027-03-04
## Sign-off
Facilitator: ______ UTC: 2027-03-02T14:45:00Z
Receipt: `release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json`
Partners screenshot paths, not slides—card is the diligence index.
Partner diligence zip (Monday invite attachment)
When D6 GREEN, zip before calendar send:
#!/usr/bin/env bash
set -euo pipefail
OUT="release-evidence/post-fest/debrief/partner-debrief-2027-03-02.zip"
zip -j "$OUT" \
release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json \
release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json \
release-evidence/post-fest/debrief/post_fest_debrief_facilitator_card.md \
release-evidence/post-fest/debrief/annex_index.json
# Add annex files (paths from index)
while IFS= read -r p; do zip -u "$OUT" "$p"; done < <(jq -r '.[].path' release-evidence/post-fest/debrief/annex_index.json)
echo "partner zip: $OUT"
Beginner tip: Name zip with UTC date + build_label—partners file hundreds of fest folders.
PowerShell verify cousin
$rec = Get-Content "release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json" | ConvertFrom-Json
if ($rec.schema -ne "post_fest_debrief_facilitator_receipt_v1") { exit 1 }
if (-not $rec.post_fest_debrief_card_ok) { exit 6 }
$index = Get-Content $rec.annex_index_path | ConvertFrom-Json
foreach ($row in $index) {
if (-not (Test-Path $row.path)) { Write-Error "MISSING: $($row.path)"; exit 3 }
}
Write-Host "post_fest_debrief_facilitator verify: OK"
CI hook before March sprint branch merge
# .github/workflows/post-fest-debrief-card.yml (sketch)
jobs:
debrief-card:
if: github.ref == 'refs/heads/march-sprint-2027'
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v4
- name: Verify facilitator receipt
run: bash scripts/verify_post_fest_debrief_facilitator.sh
- name: Assert BUILD_RECEIPT latch
run: jq -e '.post_fest_debrief_card_ok == true' release-evidence/BUILD_RECEIPT.json
Fail-closed: merge blocked when Sunday closeout cousin missing or annex path deleted in rebase.
Comparison pack (card vs cousin artifacts)
| Artifact | Owns | Audience |
|---|---|---|
| Sunday closeout | C1–C10 root diff + jsonl_annex[] |
Release owner |
| Monday facilitator card | Printable paths + hooks | Partner call |
| 7-day March evidence sprint (forward #4) | Nightly E1–E7 receipts | Engineering sprint |
| Partner empty annex case study (#5) | Recovery when annex empty | Diligence failure |
FACILITATOR_DEFINITION.md starter
# Monday post-fest debrief facilitator definition — March 2027
- **Call length:** 30–45 minutes; hard stop at 45.
- **Required attendees:** Producer (facilitator), release owner, partner diligence.
- **Evidence rule:** Every quantitative claim cites annex path on card Block B.
- **Feature discussion:** Deferred until Block C booleans read and YELLOW owners assigned.
- **Recording:** Optional; receipt + card sha256 are source of truth—not meeting notes.
- **Owner:** Producer signs before first March debrief; changes bump `receipt_version`.
BUILD_RECEIPT row catalog extension
Add after Sunday closeout columns:
| Column | Example | Set when |
|---|---|---|
post_fest_debrief_card_ok |
true |
D6 GREEN |
post_fest_debrief_facilitator_receipt |
release-evidence/post-fest/debrief/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json |
D6 |
facilitator_card_sha256 |
d4e5f6… |
D5 |
march_sprint_planning_allowed |
true |
After debrief sign-off or waiver |
Never set march_sprint_planning_allowed when post_fest_debrief_card_ok false—distinct from Sunday post_fest_debrief_allowed.
Extended scenarios H–L
H — Partner requests jq proof mid-call
Open hourly_ops_jsonl path from card; run tail -1 + jq hourly J6 gate sketch—do not improvise from memory.
I — Facilitator card edited after D5 hash
Re-run sha256 + update receipt facilitator_card_sha256 before sending partner zip.
J — Two annex rows same source receipt
Allowed when paths differ (e.g. raw export + normalized CSV)—document both in index with distinct key.
K — March sprint branch opened Sunday night
CI debrief-card job should fail until D6 receipt lands Monday evening—block promotion theater.
L — Publisher asks for October prep in same call
Park October RC label evening (blog #2 forward) to separate invite—Monday card scope is February evidence only.
Facilitator timing map (Sunday night → Monday call)
| When | Action | Gate |
|---|---|---|
| Sunday 22:15 | Sunday closeout complete | C1–C10 |
| Sunday 22:30 | Export annex_index.json from closeout |
D2 |
| Monday 08:00 | Path walk + card render | D3–D4 |
| Monday 08:30 | Hash + receipt + BUILD_RECEIPT | D5–D6 |
| Monday 09:00 | Partner zip + calendar | Invite |
| Monday 14:00 | Facilitated call with card | Block E sign-off |
Common mistakes
- Scheduling Monday debrief before Sunday C1–C10 completes (D1).
- Slides without paths—partners cannot diligence narrative (D4).
- Copying annex paths from memory—always export from closeout JSON (D2).
- Setting
post_fest_debrief_card_okwhen one annex file missing (D3). - Merging facilitator receipt into closeout receipt—cousin link only (D6).
- Skipping hour-one funnel row on card when D7 CSV exists.
Troubleshooting
| Symptom | Fix |
|---|---|
post_fest_debrief_allowed false |
Complete Sunday closeout |
jq empty jsonl_annex |
Closeout C7 fail—re-run Sunday |
| Path missing on disk | Restore from git tag or re-file source receipt |
| Partner rejects card format | Export PDF; keep sha256 of source .md |
| Boolean table disagrees with annex | Re-diff BUILD_RECEIPT root row |
Key takeaways
- Sunday closeout indexes; Monday card presents—different artifacts (D2 vs D4).
post_fest_debrief_card_okis distinct frompost_fest_debrief_allowed.- Every annex row needs owner + path + one-line hook on the printable card.
- D3 path walk is fail-closed—no Monday debrief theater on missing files.
- Hour-one funnel and refund jsonl are typical Block B rows.
verify_post_fest_debrief_facilitator.shgives CI one exit code before March sprint branches merge.- 7-day March evidence sprint (#4 published) consumes debrief outcomes into nightly E1–E7 receipts.
- Guide #43 forward owns ninety-second export preflight cousin.
- Course 281 forward wires closeout + facilitator receipts on BUILD_RECEIPT.
- Pair BUILD_RECEIPT beginner pipeline for root row discipline.
- Empty annex → partner-review case study (#5 forward), not this tutorial.
- March cluster #1 opens #2–#12 sprint runway—file facilitator receipt before October prep evenings.
FAQ
Is this replacing Sunday closeout?
No—Sunday owns C1–C10; this tutorial owns D1–D6 facilitator card from Sunday’s jsonl_annex[].
Can we debrief without a printed card?
You can—but partners lose path receipts; post_fest_debrief_card_ok requires D4 card file on disk.
Same receipt as closeout?
No—post_fest_debrief_facilitator_receipt_v1 references february_fest_closeout_receipt_v1 in cousin_receipts only.
What if annex has optional rows?
Document waivers in notes[]; D3 may use conditional walk with required: false in annex index schema extension.
Does this cover Whisper handoff?
Post-fest Whisper batch is blog #12 forward—add clips_index annex row when February same-day triage filed.
How does this relate to Thursday row review?
Thursday ritual is weekly promotion diff; Monday debrief is post-fest narrative with annex paths.
Related GamineAI reads
- Sunday February fest closeout row review
- Hour-one demo funnel snapshot CSV evening
- February refund spike threshold worksheet
- jq February hourly diff
- BUILD_RECEIPT JSON beginner pipeline
- Forward: 7-day March post-fest evidence sprint challenge
- Forward: Partner review empty annex case study
Partners remember paths, not adjectives—export Sunday jsonl_annex[], print the facilitator card, file post_fest_debrief_facilitator_receipt_v1.json, then hold Monday debrief.