Friday March Capstone Closeout BUILD_RECEIPT Row Review - Ten Minutes Before April Content Update Upload - 2026

Friday 4:30 p.m., March 27: #post-fest-sprint celebrates "March done." Monday's calendar already lists April Addressables bundle upload and summer content branch promote. BUILD_RECEIPT.json shows march_post_fest_sprint_weekly_ok: true from W11 while jq March weekly log stops at W12 with no W13 line. MERGE-002 merged Thursday but merge_exception_count still says 1. Engineering runway W13 cap row is blank while contractor invoice cites MERGE-003 that does not exist on disk.
March 2027 post-fest sprint ends with receipt sprawl—Monday debrief annex, wishlist velocity baselines, evidence sprint E7, weekly jq diffs, engineering cash caps, MERGE integers, and October RC label cousins each filed in separate paths. Teams that skip Friday March capstone jump to April Addressables uploads and lose the one BUILD_RECEIPT story summer branches need—not because engineers forgot to ship, but because nobody ran C1–C10 on the root receipt before content-update promotion.
Sunday February closeout latched post_fest_debrief_allowed after live week. Monday January reconciliation latched february_upload_allowed before first SteamPipe. Friday November capstone latched december_freeze_allowed before holiday. This Process & Workflow article defines a ten-minute Friday March capstone row review: diff March sprint root columns, consume march_post_fest_sprint_weekly_log.jsonl annex, file march_capstone_closeout_receipt_v1.json, set april_content_update_allowed: true only when C4–C8 pass—the last human gate before April Addressables upload and summer branch promotion.
Non-repetition note: Sunday February owns live-week C1–C10 closeout + jsonl annex after D1–D7. Monday January owns M1–M10 cross-era reconciliation. jq March weekly owns J1–J6 per-ISO-week diff. MERGE opinion owns M1–M6 trunk merge integers. This URL owns Friday March C1–C10 capstone diff + weekly jsonl annex latch after W10–W13 post-fest sprint ends.
Pair Monday post-fest debrief facilitator, 7-day evidence sprint, October RC label evening, cluster #1–#11, post-fest Whisper handoff (#12 published—closes March cluster), and BUILD_RECEIPT beginner pipeline.
Why this matters now (March 2027 ends Friday)
- April Addressables uploads — Unity/Godot/Unreal content pipelines burn wall-clock when BUILD_RECEIPT still points at February fest depot assumptions.
- Weekly jsonl annex debt — March sprint weekly produced four ISO weeks of diffs—capstone must index them on BUILD_RECEIPT, not leave W13 missing.
- MERGE count drift — MERGE list
exceptions[].lengthmust match rootmerge_exception_countbefore summer branch screenshots. - Engineering runway close — March cash worksheet W13 row must reconcile contractor invoices with MERGE ids.
- Whisper handoff — Post-fest handoff #12 (published) consumes
clips_index[]from February same-day triage—not January batch schema.
Direct answer: On Friday March 27, 2027 (default last business day of post-fest sprint), run C1–C10 on BUILD_RECEIPT March columns; write march_capstone_closeout_receipt_v1.json with weekly_jsonl_annex[] pointers; set april_content_update_allowed: true only when C4–C8 GREEN—block April Addressables upload when capstone diff is RED even if W12 jq weekly was GREEN.
Who this ritual is for
| Audience | Outcome |
|---|---|
| Solo founder | Ten-minute checklist before "April content ship Monday" |
| Producer | Partner zip with capstone receipt + weekly jsonl annex index |
| Release owner | Latch march_capstone_closeout_ok + april_content_update_allowed same commit |
| Working dev | Machine-readable receipt for CI before Addressables job |
Time: 10 minutes every Friday of March capstone week (default 2027-03-27 before April upload); 5 minutes optional mid-March checkpoint on W11.
Prerequisites: Cluster #1–#10 March receipts filed, evidence sprint E7 GREEN, full march_post_fest_sprint_weekly_log.jsonl through W13 (or documented waiver).
Ritual map — post-fest sprint through Friday latch
| Phase | Artifact | Layer | This article |
|---|---|---|---|
| Feb end | Sunday closeout C1–C10 | post_fest_debrief_allowed |
Prerequisite pointer |
| W10 Mon | Monday debrief D1–D6 | Facilitator annex | Indexed C5 |
| W10–W13 | jq weekly J1–J6 | Weekly jsonl | Indexed C7 |
| W10–W13 | MERGE M1–M6 | Trunk merge list | Indexed C4 |
| W10–W13 | Engineering K1–K6 | Cash runway | Indexed C6 |
| W10 | Evidence E1–E7 | Sprint receipt | Indexed C3 |
| Optional | Empty annex recovery | Partner review | Waived in notes if filed |
| Friday W13 | March capstone (this) | Root receipt + weekly annex | C1–C10 |
| April+ | Addressables / summer branch | Content update | Follows GREEN capstone |
| Forward | Whisper handoff W1–W6 | clips_index[] drain |
Follows GREEN capstone |
W12 jq GREEN with Friday capstone RED still ships content-update theater—Addressables promote a depot BUILD_RECEIPT cannot explain across February→March.
Capstone row catalog (what Friday diffs)
Store once in release-evidence/post-fest/march-capstone-row-catalog.md:
| Row key | Source cluster | Must latch? | Typical stale pattern |
|---|---|---|---|
february_fest_closeout_ok |
Feb Sunday | Yes | Pointer broken after folder move |
post_fest_debrief_allowed |
Feb Sunday | Yes | true while debrief annex stale |
march_post_fest_evidence_ok |
#4 evidence | Yes | E7 missing |
post_fest_wishlist_velocity_ok |
#3 velocity | Yes | Baseline not updated W13 |
march_post_fest_sprint_weekly_ok |
#8 jq weekly | Yes | true while jsonl missing W13 |
engineering_runway_ok |
#9 cash | Yes | W13 cap blank |
merge_exception_list_ok |
#10 MERGE | Yes | Count ≠ list length |
merge_exception_count |
#10 | Yes | Drift vs MERGE-00N |
build_label |
Cross | Yes | ≠ last MERGE build_label_after |
october_rc_branch_label_ok |
#2 October RC | Optional | Summer branch before RC evening |
april_content_update_allowed |
Output | Set Friday | Premature true Monday AM |
march_capstone_closeout_ok |
Output | Set Friday | Missing after W13 |
Add rows when Guide #48 ships—never delete March keys without receipt_version bump in capstone notes.
Gates C1–C10 (April upload blockers)
| Gate | Name | Pass criteria |
|---|---|---|
| C1 | Sprint window | sprint_window == 2027-03-post-fest-sprint on capstone receipt |
| C2 | February pointer | february_closeout_pointer exists; Sunday closeout path valid |
| C3 | Evidence sprint | march_post_fest_evidence_ok true; E7 receipt path attached |
| C4 | MERGE parity | merge_exception_list_ok true; count matches list; last label matches BUILD_RECEIPT |
| C5 | Debrief + velocity | Debrief facilitator receipt + velocity roster W13 baseline |
| C6 | Engineering runway | engineering_runway_ok true; W10–W13 cap table reconciled |
| C7 | Weekly jsonl | march_post_fest_sprint_weekly_log.jsonl lines for W10–W13; gaps waived in notes |
| C8 | Child booleans | Indexed cluster *_ok fields true on BUILD_RECEIPT or waived with producer note |
| C9 | October RC cousin | If summer branch promote planned, October RC L2 screenshot path documented |
| C10 | Diff receipt | march_capstone_closeout_receipt_v1.json committed; april_content_update_allowed set |
C4–C8 are April upload blockers when RED. C9 YELLOW allows upload only with written waiver—summer branch promote without RC label receipt.
The ten-minute Friday ritual (minute-by-minute)
| Min | Action |
|---|---|
| 0–1 | Confirm W13 jq weekly receipt exists or waiver in notes |
| 1–2 | C1–C2: open BUILD_RECEIPT; verify February closeout pointer |
| 2–4 | C4: MERGE list count + build_label parity |
| 4–6 | C5: debrief annex tail + velocity baseline row |
| 6–8 | C6–C7: engineering runway W13 + weekly jsonl wc -l |
| 8–9 | C8: child boolean sweep against catalog |
| 9–10 | Write capstone receipt; set april_content_update_allowed if C4–C8 GREEN |
Producer rule: No April Addressables calendar invite until capstone receipt path is in partner zip.
Beginner path — printable Friday card
Copy into release-evidence/post-fest/march-capstone-friday-card-2027.md:
# Friday March capstone (10 min) — before April content update
Date: 2027-03-27
Owner: producer
[ ] C1 sprint_window on capstone receipt
[ ] C2 february_closeout_pointer valid
[ ] C3 march_post_fest_evidence_ok + E7 path
[ ] C4 merge_exception_list_ok; count matches; build_label parity
[ ] C5 debrief + wishlist velocity W13 baseline
[ ] C6 engineering_runway_ok; W10–W13 caps reconciled
[ ] C7 weekly jsonl W10–W13 lines (or waiver in notes)
[ ] C8 cluster *_ok booleans GREEN or documented waiver
[ ] C9 October RC path if summer branch planned
[ ] C10 march_capstone_closeout_receipt_v1.json committed
[ ] BUILD_RECEIPT april_content_update_allowed = true (only if C4–C8 GREEN)
Signed: __________
Beginner mistake: Treating W12 jq GREEN as "March done" without filing W13 capstone line—April upload inherits incomplete annex.
Developer path — march_capstone_closeout_receipt_v1.json
{
"schema": "march_capstone_closeout_receipt_v1",
"sprint_window": "2027-03-post-fest-sprint",
"generated_at": "2027-03-27T16:45:00Z",
"february_closeout_pointer": "release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json",
"weekly_jsonl_annex": [
{
"iso_week": "2027-W10",
"receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W10.json",
"jq_verify_exit": 0
},
{
"iso_week": "2027-W11",
"receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W11.json",
"jq_verify_exit": 0
},
{
"iso_week": "2027-W12",
"receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W12.json",
"jq_verify_exit": 0
},
{
"iso_week": "2027-W13",
"receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W13.json",
"jq_verify_exit": 0
}
],
"cluster_index": {
"debrief_facilitator": "release-evidence/post-fest/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json",
"wishlist_velocity": "release-evidence/post-fest/POST_FEST_WISHLIST_VELOCITY_RECEIPT.json",
"evidence_sprint": "release-evidence/post-fest/MARCH_POST_FEST_EVIDENCE_CHALLENGE_RECEIPT.json",
"merge_exception_list": "release-evidence/post-fest/MERGE_EXCEPTION_LIST_RECEIPT.json",
"engineering_runway": "release-evidence/ops/march_engineering_runway_receipt_v1.json"
},
"row_diff": [
{"field": "merge_exception_count", "before": 1, "after": 2, "delta": "+1"},
{"field": "build_label", "before": "fest-demo-2027-02-rc3-postfest-1", "after": "fest-demo-2027-03-capstone-1", "delta": "bump"}
],
"gates": {
"C1": "pass",
"C2": "pass",
"C3": "pass",
"C4": "pass",
"C5": "pass",
"C6": "pass",
"C7": "pass",
"C8": "pass",
"C9": "yellow",
"C10": "pass"
},
"march_capstone_closeout_ok": true,
"april_content_update_allowed": true,
"forward_whisper_handoff": "release-evidence/post-fest/POST_FEST_WHISPER_HANDOFF_RECEIPT.json"
}
Store canonical copy at release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json.
BUILD_RECEIPT extension
{
"march_capstone_closeout_ok": true,
"april_content_update_allowed": true,
"march_capstone_closeout_receipt": "release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json",
"merge_exception_count": 2,
"build_label": "fest-demo-2027-03-capstone-1",
"march_post_fest_sprint_weekly_ok": true
}
Fail-closed: If weekly_jsonl_annex[].length < 4 without producer waiver in notes, C7 fails.
verify_march_capstone_closeout.sh
#!/usr/bin/env bash
set -euo pipefail
CAP="${1:-release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json}"
BR="${2:-BUILD_RECEIPT.json}"
MERGE="${3:-release-evidence/post-fest/MERGE_EXCEPTION_LIST_RECEIPT.json}"
jq -e '.schema == "march_capstone_closeout_receipt_v1"' "$CAP" || exit 1
jq -e '.february_closeout_pointer != null' "$CAP" || { echo "C2 fail"; exit 2; }
WEEKS=$(jq '.weekly_jsonl_annex | length' "$CAP")
[[ "$WEEKS" -ge 4 ]] || { echo "C7 fail: need W10–W13 annex"; exit 7; }
MC=$(jq -r '.merge_exception_count // empty' "$BR")
ML=$(jq '.exceptions | length' "$MERGE")
[[ "$MC" == "$ML" ]] || { echo "C4 fail: merge count drift"; exit 4; }
LAST=$(jq -r '.exceptions[-1].build_label_after // empty' "$MERGE")
BL=$(jq -r '.build_label' "$BR")
[[ -z "$LAST" || "$LAST" == "$BL" ]] || { echo "C4 fail: label mismatch"; exit 4; }
jq -e '.march_capstone_closeout_ok == true and .april_content_update_allowed == true' "$CAP" || exit 10
echo "march_capstone_closeout verify: OK"
Exit codes: 1 schema, 2 C2 pointer, 4 C4 MERGE, 7 C7 jsonl, 10 C10 latch.
Capstone vs weekly jq vs Sunday February closeout
| Ritual | Cadence | Schema | Output latch |
|---|---|---|---|
| Sunday February | D7 night | february_fest_closeout_receipt_v1 |
post_fest_debrief_allowed |
| jq March weekly | Each ISO week | march_post_fest_sprint_receipt_v1 |
march_post_fest_sprint_weekly_ok |
| March Friday capstone | W13 Friday | march_capstone_closeout_receipt_v1 |
april_content_update_allowed |
| Monday January | First Monday Jan | january_capstone_reconciliation_receipt_v1 |
february_upload_allowed |
Rule: Weekly jq feeds capstone annex—it does not replace Friday C1–C10.
jq one-liners (Friday diff pack)
# Weekly jsonl line count — expect 4 for W10–W13
jq -s 'length' release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl
# Last weekly receipt iso_week
jq -r '.weekly_jsonl_annex[-1].iso_week' release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json
# MERGE tail id vs BUILD_RECEIPT count
echo "merge_count=$(jq -r '.merge_exception_count' BUILD_RECEIPT.json)"
jq -r '.exceptions[-1].id' release-evidence/post-fest/MERGE_EXCEPTION_LIST_RECEIPT.json
# Engineering runway W13 cap vs actual
jq '.weeks[] | select(.iso_week=="2027-W13")' release-evidence/ops/march_engineering_runway_receipt_v1.json
Attach jq output to capstone notes when C9 is YELLOW.
Worked example — synthesized W13 Friday
| Step | Action | Result |
|---|---|---|
| W13 Fri 4:00 | Open BUILD_RECEIPT March columns | march_post_fest_sprint_weekly_ok: true (stale) |
| W13 Fri 4:02 | Run jq weekly verify W13 | Receipt filed; jsonl line appended |
| W13 Fri 4:04 | C4 MERGE parity | MERGE-002 matches count 2 |
| W13 Fri 4:06 | C6 runway | W13 cap $1,800 matches invoice |
| W13 Fri 4:08 | Write capstone receipt | weekly_jsonl_annex four lines |
| W13 Fri 4:10 | verify exit 0 | april_content_update_allowed: true |
| Mon Apr 1 | Addressables job | CI checks capstone path before upload |
Proof table
| Evidence | Proves | Fail signal |
|---|---|---|
weekly_jsonl_annex[] |
C7 four-week trail | W13 missing |
| MERGE list JSON | C4 integer parity | Count drift |
| Engineering runway | C6 cash truth | W13 blank |
| Evidence E7 | C3 sprint complete | march_post_fest_evidence_ok false |
| February pointer | C2 lineage | Broken closeout path |
| verify exit 0 | C10 latch | Verbal "March done" |
| Partner zip | Audit bundle | Capstone missing |
Scenarios A–H
| ID | Situation | Move |
|---|---|---|
| A | Standard W13 closeout | Full C1–C10 |
| B | Zero MERGE merges | C4 passes with merge_exception_count: 0 |
| C | Empty annex recovery filed | Document waiver in notes; C8 cites recovery path |
| D | Solo dev, one-person sprint | Same ritual—ten minutes still |
| E | October RC same week | C9 must GREEN or YELLOW waiver before summer promote |
| F | W12 jq RED | Fix weekly before capstone—no Friday waiver on C7 |
| G | Contractor invoice without MERGE id | C6 fail until ER3 resolved |
| H | Forward Whisper handoff | C10 sets forward_whisper_handoff path for #12 |
Engine / content-pipeline notes
| Engine | April upload discipline |
|---|---|
| Unity Addressables | Capstone build_label must match player-visible label before remote catalog push |
| Unreal pak chunks | Document chunk manifest path in capstone cluster_index |
| Godot export presets | PCK hash in weekly W13 receipt notes |
| Steam depot | Pair October RC evening when promoting summer branch |
CI sketch (GitHub Actions)
- name: March capstone closeout verify
if: github.event.schedule == '0 16 * * 5' # Friday 16:00 UTC
run: |
./scripts/verify_march_capstone_closeout.sh
./scripts/verify_march_post_fest_sprint.sh release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W13.json
Block april-content-update workflow unless verify exit 0.
Partner diligence zip (Friday pack)
Include in partner-diligence/march-2027-capstone.zip:
MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json- Full
march_post_fest_sprint_weekly_log.jsonl MERGE_EXCEPTION_LIST_RECEIPT.jsonmarch_engineering_runway_receipt_v1.json- Sunday February closeout pointer target
- Optional: empty annex recovery if C8 waiver
Outbound references
- Unity Addressables content update — remote catalog discipline
- Steamworks branches — depot assignment after content update
Related GamineAI reads
- Sunday February closeout
- Monday January reconciliation
- jq March weekly sprint
- MERGE exception opinion
- March engineering runway
- 7-day evidence sprint
- October RC label evening
- Forward: Post-fest Whisper handoff (#12)
Key takeaways
- March 2027 ends Friday with C1–C10 capstone—not "jq was GREEN last week."
march_capstone_closeout_receipt_v1.jsonindexes W10–W13 weekly jsonl annex.april_content_update_allowedlatches only when C4–C8 GREEN.- Sunday February pointer is C2 prerequisite—not optional folklore.
- MERGE opinion C4 requires count + label parity.
- Engineering runway C6 closes W13 contractor cap.
- jq March weekly feeds capstone—it does not replace it.
- Post-fest Whisper handoff (#12 published) consumes
forward_whisper_handoffpath on capstone receipt. verify_march_capstone_closeout.shgives CI one exit code before Addressables.- Partner zip includes weekly log + MERGE list + runway receipt.
- C9 YELLOW allows upload only with October RC waiver documented.
- Prevention beats April content update on February fest depot ghosts.
- Ten-minute Friday card is enough for solo founders—same bar as November Friday cousin.
FAQ
Is this the same as Sunday February closeout?
No—Sunday owns live-week D7 annex; Friday March owns post-fest W10–W13 weekly annex before April upload.
Can we skip W13 if W12 was GREEN?
No—C7 expects four ISO weeks or documented producer waiver in notes.
How does Monday January reconciliation relate?
Cousin capstone latch pattern—January february_upload_allowed, March april_content_update_allowed.
What if empty annex recovery was filed?
C8 waiver with recovery receipt path—capstone still runs; do not skip C1–C10.
When does Whisper handoff start?
After C10 GREEN—capstone sets forward_whisper_handoff pointer to post-fest handoff receipt (#12 published).
Does this block October RC label evening?
No—C9 documents RC path when summer branch promote is planned same month.
RED / YELLOW / GREEN routing (C gates)
| Signal | Route |
|---|---|
| C2 RED | Re-run Sunday closeout pointer |
| C4 RED | MERGE opinion verify |
| C7 RED | Append W13 jq weekly line |
| C6 RED | Engineering runway W13 reconcile |
| All GREEN | Set april_content_update_allowed; schedule Addressables |
Closing
March post-fest sprint without Friday capstone becomes April upload folklore—weekly jq lines, MERGE integers, and engineering caps drift from February closeout truth while summer branches promote. File march_capstone_closeout_receipt_v1.json, consume march_post_fest_sprint_weekly_log.jsonl W10–W13, and run verify_march_capstone_closeout.sh before Addressables spend wall-clock. Beginners use the ten-minute card; producers block April calendar invites until C4–C8 GREEN; working devs wire Friday CI. Post-fest Whisper handoff drains clips_index[] after capstone latch—closing March cluster #1–#12.