2026 Friday March capstone closeout BUILD_RECEIPT row review—ten minutes before April content update upload, gates C1–C10, march_capstone_closeout_receipt_v1.json, april_content_update_allowed, pairs Sunday February closeout and Monday January reconciliation.

By GamineAI Team

Friday March Capstone Closeout BUILD_RECEIPT Row Review - Ten Minutes Before April Content Update Upload - 2026

Pixel-art hero for Friday March capstone closeout BUILD_RECEIPT row review before April content update 2026

Friday 4:30 p.m., March 27: #post-fest-sprint celebrates "March done." Monday's calendar already lists April Addressables bundle upload and summer content branch promote. BUILD_RECEIPT.json shows march_post_fest_sprint_weekly_ok: true from W11 while jq March weekly log stops at W12 with no W13 line. MERGE-002 merged Thursday but merge_exception_count still says 1. Engineering runway W13 cap row is blank while contractor invoice cites MERGE-003 that does not exist on disk.

March 2027 post-fest sprint ends with receipt sprawl—Monday debrief annex, wishlist velocity baselines, evidence sprint E7, weekly jq diffs, engineering cash caps, MERGE integers, and October RC label cousins each filed in separate paths. Teams that skip Friday March capstone jump to April Addressables uploads and lose the one BUILD_RECEIPT story summer branches need—not because engineers forgot to ship, but because nobody ran C1–C10 on the root receipt before content-update promotion.

Sunday February closeout latched post_fest_debrief_allowed after live week. Monday January reconciliation latched february_upload_allowed before first SteamPipe. Friday November capstone latched december_freeze_allowed before holiday. This Process & Workflow article defines a ten-minute Friday March capstone row review: diff March sprint root columns, consume march_post_fest_sprint_weekly_log.jsonl annex, file march_capstone_closeout_receipt_v1.json, set april_content_update_allowed: true only when C4–C8 pass—the last human gate before April Addressables upload and summer branch promotion.

Non-repetition note: Sunday February owns live-week C1–C10 closeout + jsonl annex after D1–D7. Monday January owns M1–M10 cross-era reconciliation. jq March weekly owns J1–J6 per-ISO-week diff. MERGE opinion owns M1–M6 trunk merge integers. This URL owns Friday March C1–C10 capstone diff + weekly jsonl annex latch after W10–W13 post-fest sprint ends.

Pair Monday post-fest debrief facilitator, 7-day evidence sprint, October RC label evening, cluster #1–#11, post-fest Whisper handoff (#12 published—closes March cluster), and BUILD_RECEIPT beginner pipeline.

Why this matters now (March 2027 ends Friday)

  1. April Addressables uploads — Unity/Godot/Unreal content pipelines burn wall-clock when BUILD_RECEIPT still points at February fest depot assumptions.
  2. Weekly jsonl annex debtMarch sprint weekly produced four ISO weeks of diffs—capstone must index them on BUILD_RECEIPT, not leave W13 missing.
  3. MERGE count driftMERGE list exceptions[].length must match root merge_exception_count before summer branch screenshots.
  4. Engineering runway closeMarch cash worksheet W13 row must reconcile contractor invoices with MERGE ids.
  5. Whisper handoffPost-fest handoff #12 (published) consumes clips_index[] from February same-day triage—not January batch schema.

Direct answer: On Friday March 27, 2027 (default last business day of post-fest sprint), run C1–C10 on BUILD_RECEIPT March columns; write march_capstone_closeout_receipt_v1.json with weekly_jsonl_annex[] pointers; set april_content_update_allowed: true only when C4–C8 GREEN—block April Addressables upload when capstone diff is RED even if W12 jq weekly was GREEN.

Who this ritual is for

Audience Outcome
Solo founder Ten-minute checklist before "April content ship Monday"
Producer Partner zip with capstone receipt + weekly jsonl annex index
Release owner Latch march_capstone_closeout_ok + april_content_update_allowed same commit
Working dev Machine-readable receipt for CI before Addressables job

Time: 10 minutes every Friday of March capstone week (default 2027-03-27 before April upload); 5 minutes optional mid-March checkpoint on W11.
Prerequisites: Cluster #1–#10 March receipts filed, evidence sprint E7 GREEN, full march_post_fest_sprint_weekly_log.jsonl through W13 (or documented waiver).

Ritual map — post-fest sprint through Friday latch

Phase Artifact Layer This article
Feb end Sunday closeout C1–C10 post_fest_debrief_allowed Prerequisite pointer
W10 Mon Monday debrief D1–D6 Facilitator annex Indexed C5
W10–W13 jq weekly J1–J6 Weekly jsonl Indexed C7
W10–W13 MERGE M1–M6 Trunk merge list Indexed C4
W10–W13 Engineering K1–K6 Cash runway Indexed C6
W10 Evidence E1–E7 Sprint receipt Indexed C3
Optional Empty annex recovery Partner review Waived in notes if filed
Friday W13 March capstone (this) Root receipt + weekly annex C1–C10
April+ Addressables / summer branch Content update Follows GREEN capstone
Forward Whisper handoff W1–W6 clips_index[] drain Follows GREEN capstone

W12 jq GREEN with Friday capstone RED still ships content-update theater—Addressables promote a depot BUILD_RECEIPT cannot explain across February→March.

Capstone row catalog (what Friday diffs)

Store once in release-evidence/post-fest/march-capstone-row-catalog.md:

Row key Source cluster Must latch? Typical stale pattern
february_fest_closeout_ok Feb Sunday Yes Pointer broken after folder move
post_fest_debrief_allowed Feb Sunday Yes true while debrief annex stale
march_post_fest_evidence_ok #4 evidence Yes E7 missing
post_fest_wishlist_velocity_ok #3 velocity Yes Baseline not updated W13
march_post_fest_sprint_weekly_ok #8 jq weekly Yes true while jsonl missing W13
engineering_runway_ok #9 cash Yes W13 cap blank
merge_exception_list_ok #10 MERGE Yes Count ≠ list length
merge_exception_count #10 Yes Drift vs MERGE-00N
build_label Cross Yes ≠ last MERGE build_label_after
october_rc_branch_label_ok #2 October RC Optional Summer branch before RC evening
april_content_update_allowed Output Set Friday Premature true Monday AM
march_capstone_closeout_ok Output Set Friday Missing after W13

Add rows when Guide #48 ships—never delete March keys without receipt_version bump in capstone notes.

Gates C1–C10 (April upload blockers)

Gate Name Pass criteria
C1 Sprint window sprint_window == 2027-03-post-fest-sprint on capstone receipt
C2 February pointer february_closeout_pointer exists; Sunday closeout path valid
C3 Evidence sprint march_post_fest_evidence_ok true; E7 receipt path attached
C4 MERGE parity merge_exception_list_ok true; count matches list; last label matches BUILD_RECEIPT
C5 Debrief + velocity Debrief facilitator receipt + velocity roster W13 baseline
C6 Engineering runway engineering_runway_ok true; W10–W13 cap table reconciled
C7 Weekly jsonl march_post_fest_sprint_weekly_log.jsonl lines for W10–W13; gaps waived in notes
C8 Child booleans Indexed cluster *_ok fields true on BUILD_RECEIPT or waived with producer note
C9 October RC cousin If summer branch promote planned, October RC L2 screenshot path documented
C10 Diff receipt march_capstone_closeout_receipt_v1.json committed; april_content_update_allowed set

C4–C8 are April upload blockers when RED. C9 YELLOW allows upload only with written waiver—summer branch promote without RC label receipt.

The ten-minute Friday ritual (minute-by-minute)

Min Action
0–1 Confirm W13 jq weekly receipt exists or waiver in notes
1–2 C1–C2: open BUILD_RECEIPT; verify February closeout pointer
2–4 C4: MERGE list count + build_label parity
4–6 C5: debrief annex tail + velocity baseline row
6–8 C6–C7: engineering runway W13 + weekly jsonl wc -l
8–9 C8: child boolean sweep against catalog
9–10 Write capstone receipt; set april_content_update_allowed if C4–C8 GREEN

Producer rule: No April Addressables calendar invite until capstone receipt path is in partner zip.

Beginner path — printable Friday card

Copy into release-evidence/post-fest/march-capstone-friday-card-2027.md:

# Friday March capstone (10 min) — before April content update
Date: 2027-03-27
Owner: producer

[ ] C1 sprint_window on capstone receipt
[ ] C2 february_closeout_pointer valid
[ ] C3 march_post_fest_evidence_ok + E7 path
[ ] C4 merge_exception_list_ok; count matches; build_label parity
[ ] C5 debrief + wishlist velocity W13 baseline
[ ] C6 engineering_runway_ok; W10–W13 caps reconciled
[ ] C7 weekly jsonl W10–W13 lines (or waiver in notes)
[ ] C8 cluster *_ok booleans GREEN or documented waiver
[ ] C9 October RC path if summer branch planned
[ ] C10 march_capstone_closeout_receipt_v1.json committed
[ ] BUILD_RECEIPT april_content_update_allowed = true (only if C4–C8 GREEN)

Signed: __________

Beginner mistake: Treating W12 jq GREEN as "March done" without filing W13 capstone line—April upload inherits incomplete annex.

Developer path — march_capstone_closeout_receipt_v1.json

{
  "schema": "march_capstone_closeout_receipt_v1",
  "sprint_window": "2027-03-post-fest-sprint",
  "generated_at": "2027-03-27T16:45:00Z",
  "february_closeout_pointer": "release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json",
  "weekly_jsonl_annex": [
    {
      "iso_week": "2027-W10",
      "receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W10.json",
      "jq_verify_exit": 0
    },
    {
      "iso_week": "2027-W11",
      "receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W11.json",
      "jq_verify_exit": 0
    },
    {
      "iso_week": "2027-W12",
      "receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W12.json",
      "jq_verify_exit": 0
    },
    {
      "iso_week": "2027-W13",
      "receipt_path": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W13.json",
      "jq_verify_exit": 0
    }
  ],
  "cluster_index": {
    "debrief_facilitator": "release-evidence/post-fest/POST_FEST_DEBRIEF_FACILITATOR_RECEIPT.json",
    "wishlist_velocity": "release-evidence/post-fest/POST_FEST_WISHLIST_VELOCITY_RECEIPT.json",
    "evidence_sprint": "release-evidence/post-fest/MARCH_POST_FEST_EVIDENCE_CHALLENGE_RECEIPT.json",
    "merge_exception_list": "release-evidence/post-fest/MERGE_EXCEPTION_LIST_RECEIPT.json",
    "engineering_runway": "release-evidence/ops/march_engineering_runway_receipt_v1.json"
  },
  "row_diff": [
    {"field": "merge_exception_count", "before": 1, "after": 2, "delta": "+1"},
    {"field": "build_label", "before": "fest-demo-2027-02-rc3-postfest-1", "after": "fest-demo-2027-03-capstone-1", "delta": "bump"}
  ],
  "gates": {
    "C1": "pass",
    "C2": "pass",
    "C3": "pass",
    "C4": "pass",
    "C5": "pass",
    "C6": "pass",
    "C7": "pass",
    "C8": "pass",
    "C9": "yellow",
    "C10": "pass"
  },
  "march_capstone_closeout_ok": true,
  "april_content_update_allowed": true,
  "forward_whisper_handoff": "release-evidence/post-fest/POST_FEST_WHISPER_HANDOFF_RECEIPT.json"
}

Store canonical copy at release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json.

BUILD_RECEIPT extension

{
  "march_capstone_closeout_ok": true,
  "april_content_update_allowed": true,
  "march_capstone_closeout_receipt": "release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json",
  "merge_exception_count": 2,
  "build_label": "fest-demo-2027-03-capstone-1",
  "march_post_fest_sprint_weekly_ok": true
}

Fail-closed: If weekly_jsonl_annex[].length < 4 without producer waiver in notes, C7 fails.

verify_march_capstone_closeout.sh

#!/usr/bin/env bash
set -euo pipefail
CAP="${1:-release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json}"
BR="${2:-BUILD_RECEIPT.json}"
MERGE="${3:-release-evidence/post-fest/MERGE_EXCEPTION_LIST_RECEIPT.json}"

jq -e '.schema == "march_capstone_closeout_receipt_v1"' "$CAP" || exit 1

jq -e '.february_closeout_pointer != null' "$CAP" || { echo "C2 fail"; exit 2; }

WEEKS=$(jq '.weekly_jsonl_annex | length' "$CAP")
[[ "$WEEKS" -ge 4 ]] || { echo "C7 fail: need W10–W13 annex"; exit 7; }

MC=$(jq -r '.merge_exception_count // empty' "$BR")
ML=$(jq '.exceptions | length' "$MERGE")
[[ "$MC" == "$ML" ]] || { echo "C4 fail: merge count drift"; exit 4; }

LAST=$(jq -r '.exceptions[-1].build_label_after // empty' "$MERGE")
BL=$(jq -r '.build_label' "$BR")
[[ -z "$LAST" || "$LAST" == "$BL" ]] || { echo "C4 fail: label mismatch"; exit 4; }

jq -e '.march_capstone_closeout_ok == true and .april_content_update_allowed == true' "$CAP" || exit 10
echo "march_capstone_closeout verify: OK"

Exit codes: 1 schema, 2 C2 pointer, 4 C4 MERGE, 7 C7 jsonl, 10 C10 latch.

Capstone vs weekly jq vs Sunday February closeout

Ritual Cadence Schema Output latch
Sunday February D7 night february_fest_closeout_receipt_v1 post_fest_debrief_allowed
jq March weekly Each ISO week march_post_fest_sprint_receipt_v1 march_post_fest_sprint_weekly_ok
March Friday capstone W13 Friday march_capstone_closeout_receipt_v1 april_content_update_allowed
Monday January First Monday Jan january_capstone_reconciliation_receipt_v1 february_upload_allowed

Rule: Weekly jq feeds capstone annex—it does not replace Friday C1–C10.

jq one-liners (Friday diff pack)

# Weekly jsonl line count — expect 4 for W10–W13
jq -s 'length' release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl

# Last weekly receipt iso_week
jq -r '.weekly_jsonl_annex[-1].iso_week' release-evidence/post-fest/MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json

# MERGE tail id vs BUILD_RECEIPT count
echo "merge_count=$(jq -r '.merge_exception_count' BUILD_RECEIPT.json)"
jq -r '.exceptions[-1].id' release-evidence/post-fest/MERGE_EXCEPTION_LIST_RECEIPT.json

# Engineering runway W13 cap vs actual
jq '.weeks[] | select(.iso_week=="2027-W13")' release-evidence/ops/march_engineering_runway_receipt_v1.json

Attach jq output to capstone notes when C9 is YELLOW.

Worked example — synthesized W13 Friday

Step Action Result
W13 Fri 4:00 Open BUILD_RECEIPT March columns march_post_fest_sprint_weekly_ok: true (stale)
W13 Fri 4:02 Run jq weekly verify W13 Receipt filed; jsonl line appended
W13 Fri 4:04 C4 MERGE parity MERGE-002 matches count 2
W13 Fri 4:06 C6 runway W13 cap $1,800 matches invoice
W13 Fri 4:08 Write capstone receipt weekly_jsonl_annex four lines
W13 Fri 4:10 verify exit 0 april_content_update_allowed: true
Mon Apr 1 Addressables job CI checks capstone path before upload

Proof table

Evidence Proves Fail signal
weekly_jsonl_annex[] C7 four-week trail W13 missing
MERGE list JSON C4 integer parity Count drift
Engineering runway C6 cash truth W13 blank
Evidence E7 C3 sprint complete march_post_fest_evidence_ok false
February pointer C2 lineage Broken closeout path
verify exit 0 C10 latch Verbal "March done"
Partner zip Audit bundle Capstone missing

Scenarios A–H

ID Situation Move
A Standard W13 closeout Full C1–C10
B Zero MERGE merges C4 passes with merge_exception_count: 0
C Empty annex recovery filed Document waiver in notes; C8 cites recovery path
D Solo dev, one-person sprint Same ritual—ten minutes still
E October RC same week C9 must GREEN or YELLOW waiver before summer promote
F W12 jq RED Fix weekly before capstone—no Friday waiver on C7
G Contractor invoice without MERGE id C6 fail until ER3 resolved
H Forward Whisper handoff C10 sets forward_whisper_handoff path for #12

Engine / content-pipeline notes

Engine April upload discipline
Unity Addressables Capstone build_label must match player-visible label before remote catalog push
Unreal pak chunks Document chunk manifest path in capstone cluster_index
Godot export presets PCK hash in weekly W13 receipt notes
Steam depot Pair October RC evening when promoting summer branch

CI sketch (GitHub Actions)

- name: March capstone closeout verify
  if: github.event.schedule == '0 16 * * 5'  # Friday 16:00 UTC
  run: |
    ./scripts/verify_march_capstone_closeout.sh
    ./scripts/verify_march_post_fest_sprint.sh release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W13.json

Block april-content-update workflow unless verify exit 0.

Partner diligence zip (Friday pack)

Include in partner-diligence/march-2027-capstone.zip:

  1. MARCH_CAPSTONE_CLOSEOUT_RECEIPT.json
  2. Full march_post_fest_sprint_weekly_log.jsonl
  3. MERGE_EXCEPTION_LIST_RECEIPT.json
  4. march_engineering_runway_receipt_v1.json
  5. Sunday February closeout pointer target
  6. Optional: empty annex recovery if C8 waiver

Outbound references

Related GamineAI reads

Key takeaways

  1. March 2027 ends Friday with C1–C10 capstone—not "jq was GREEN last week."
  2. march_capstone_closeout_receipt_v1.json indexes W10–W13 weekly jsonl annex.
  3. april_content_update_allowed latches only when C4–C8 GREEN.
  4. Sunday February pointer is C2 prerequisite—not optional folklore.
  5. MERGE opinion C4 requires count + label parity.
  6. Engineering runway C6 closes W13 contractor cap.
  7. jq March weekly feeds capstone—it does not replace it.
  8. Post-fest Whisper handoff (#12 published) consumes forward_whisper_handoff path on capstone receipt.
  9. verify_march_capstone_closeout.sh gives CI one exit code before Addressables.
  10. Partner zip includes weekly log + MERGE list + runway receipt.
  11. C9 YELLOW allows upload only with October RC waiver documented.
  12. Prevention beats April content update on February fest depot ghosts.
  13. Ten-minute Friday card is enough for solo founders—same bar as November Friday cousin.

FAQ

Is this the same as Sunday February closeout?

No—Sunday owns live-week D7 annex; Friday March owns post-fest W10–W13 weekly annex before April upload.

Can we skip W13 if W12 was GREEN?

No—C7 expects four ISO weeks or documented producer waiver in notes.

How does Monday January reconciliation relate?

Cousin capstone latch pattern—January february_upload_allowed, March april_content_update_allowed.

What if empty annex recovery was filed?

C8 waiver with recovery receipt path—capstone still runs; do not skip C1–C10.

When does Whisper handoff start?

After C10 GREEN—capstone sets forward_whisper_handoff pointer to post-fest handoff receipt (#12 published).

Does this block October RC label evening?

No—C9 documents RC path when summer branch promote is planned same month.

RED / YELLOW / GREEN routing (C gates)

Signal Route
C2 RED Re-run Sunday closeout pointer
C4 RED MERGE opinion verify
C7 RED Append W13 jq weekly line
C6 RED Engineering runway W13 reconcile
All GREEN Set april_content_update_allowed; schedule Addressables

Closing

March post-fest sprint without Friday capstone becomes April upload folklore—weekly jq lines, MERGE integers, and engineering caps drift from February closeout truth while summer branches promote. File march_capstone_closeout_receipt_v1.json, consume march_post_fest_sprint_weekly_log.jsonl W10–W13, and run verify_march_capstone_closeout.sh before Addressables spend wall-clock. Beginners use the ten-minute card; producers block April calendar invites until C4–C8 GREEN; working devs wire Friday CI. Post-fest Whisper handoff drains clips_index[] after capstone latch—closing March cluster #1–#12.