jq Gate Sketch for march_post_fest_sprint_receipt_v1.json Weekly BUILD_RECEIPT Row Diff - 2026

March 2027, week two: 7-day evidence sprint finished E7 GREEN. Engineering merged three post-fest branches. Producer asks "did we drift from February closeout?" Someone pastes a Thursday row review diff—but that ritual diffs promotion columns weekly, not post-fest sprint truth against Sunday February closeout. Another teammate proposes copying February hourly jsonl—wrong cadence, wrong schema.
March needs march_post_fest_sprint_receipt_v1.json filed once per ISO week with row_diff[] against the prior week snapshot and a february_closeout_pointer to february_fest_closeout_receipt_v1.json—not a second hourly log.
This Programming & Technical sketch ships march_post_fest_sprint_receipt_v1.json, verify_march_post_fest_sprint.sh, gates J1–J6, copy-paste jq for CI and facilitator laptops—strategy above per-evening tutorials, below Guide #40 forward.
Non-repetition note: February hourly jq owns D1–D7 per-hour february_fest_live_ops jsonl. Thursday row review owns ten-minute weekly promotion diff. January reentry pointer owns pre-live capstone crosswalk. This URL owns March weekly march_post_fest_sprint row diff with February closeout pointer.
Pair Monday debrief facilitator, evidence sprint E1–E7, empty annex recovery, cluster #1–#7, forward #9 March engineering cash runway.
Why this matters now (March 2027 post-fest sprint)
- Weekly drift after fest —
build_label, velocity baselines, and MERGE exceptions change across March—not only on Thursdays. - Closeout pointer debt — Teams diff BUILD_RECEIPT without anchoring Sunday closeout
jsonl_annex[]—partners ask "which fest truth?" - Evidence sprint handoff — E7 sets
march_post_fest_evidence_ok; weekly receipt extends that latch week over week. - October prep collision — March merges without weekly diff reintroduce setlive drift before October RC label.
- Friday March capstone — Forward #11 expects
march_post_fest_sprint_weekly_log.jsonltrail—not reconstructed Slack.
Direct answer: File weekly march_post_fest_sprint_receipt_v1.json with february_closeout_pointer, append march_post_fest_sprint_weekly_log.jsonl, run verify_march_post_fest_sprint.sh, gates J1–J6, set BUILD_RECEIPT march_post_fest_sprint_weekly_ok: true before declaring Friday sprint stand-up GREEN.
Who this sketch is for
| Audience | You will… |
|---|---|
| Beginner | Copy bash + jq one-liners; read weekly vs hourly table |
| Facilitator | Paste weekly diff into #post-fest-sprint |
| Engineer | Wire CI cron every Monday 09:00 during March sprint |
| Producer | Block MERGE comms until J2 closeout pointer resolves |
Time: ~45 minutes first weekly template; ~3 minutes per week after scripts pinned.
Mental model — weekly sprint vs hourly live vs Thursday review
| Cadence | Artifact | Proves |
|---|---|---|
| Hourly (fest) | February live ops jq | D1–D7 stand-up deltas |
| Weekly (promotion) | Thursday row review | Ten-minute BUILD_RECEIPT promotion columns |
| Weekly (post-fest sprint) | march_post_fest_sprint_receipt_v1.json |
Sprint snapshot + row_diff[] vs prior week + closeout pointer |
| Capstone (fest end) | Sunday closeout | february_fest_closeout_receipt_v1 + jsonl_annex[] |
| BUILD_RECEIPT | Root row | march_post_fest_sprint_weekly_ok |
Rule: March weekly jq does not replace Thursday review—it anchors post-fest work to February closeout and feeds forward #11 Friday capstone.
Beginner path — weekly diff vs daily hourly cousin
Memorize one sentence: hourly = live fest noise; weekly = post-fest sprint signal.
| Question | Hourly cousin | This weekly sketch |
|---|---|---|
| When? | D1–D7 live week | ISO weeks 2027-W10…W13 (example March) |
| Log file | february_fest_live_ops_hourly_log.jsonl |
march_post_fest_sprint_weekly_log.jsonl |
| Anchor | Prior hour | Prior week + February closeout pointer |
| Prereq | Live cluster receipts | march_post_fest_evidence_ok from E7 |
Beginner mistake: Appending hourly lines in March—use one jsonl line per ISO week.
march_post_fest_sprint_receipt_v1.json (schema)
{
"schema": "march_post_fest_sprint_receipt_v1",
"sprint_window": "2027-03-post-fest-sprint",
"iso_week": "2027-W11",
"build_label": "fest-demo-2027-02-rc3-postfest-1",
"february_closeout_pointer": {
"path": "release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json",
"february_fest_closeout_ok": true,
"post_fest_debrief_allowed": true
},
"snapshot": {
"march_post_fest_evidence_ok": true,
"wishlist_velocity_baseline_ok": true,
"merge_exception_list_ok": false,
"engineering_runway_ok": null,
"build_label": "fest-demo-2027-02-rc3-postfest-1"
},
"row_diff": [
{"field": "build_label", "before": "fest-demo-2027-02-rc3", "after": "fest-demo-2027-02-rc3-postfest-1", "delta": "bump"},
{"field": "march_post_fest_evidence_ok", "before": true, "after": true, "delta": "unchanged"},
{"field": "merge_exception_list_ok", "before": null, "after": false, "delta": "new_column"}
],
"gates": {
"J1_schema": "pass",
"J2_closeout_pointer": "pass",
"J3_prior_week": "pass",
"J4_evidence_ok": "pass",
"J5_row_diff_honest": "pass",
"J6_receipt_filed": "pass"
},
"march_post_fest_sprint_weekly_ok": true
}
Weekly log (jsonl)
release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl — one line per ISO week:
{"iso_week":"2027-W10","build_label":"fest-demo-2027-02-rc3","march_post_fest_sprint_weekly_ok":true,"receipt_path":"release-evidence/post-fest/MARCH_SPRINT_RECEIPT_W10.json","closeout_pointer":"release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json"}
Gates J1–J6
| Gate | Check | Pass when |
|---|---|---|
| J1 | Schema + sprint_window | schema == march_post_fest_sprint_receipt_v1 |
| J2 | February closeout pointer | Pointer path exists; february_fest_closeout_ok == true |
| J3 | Prior week in jsonl | Previous ISO week line exists or W10 first-week waiver in notes |
| J4 | Evidence sprint latch | march_post_fest_evidence_ok == true on BUILD_RECEIPT |
| J5 | row_diff honest |
Deltas recompute from before/after; build_label row present |
| J6 | Receipt + verify script | march_post_fest_sprint_weekly_ok: true; verify exit 0 |
J2 fail-closed: Missing or empty closeout annex → run recovery before weekly sprint W11. Do not copy february_fest_live_ops_hourly_log.jsonl into March—weekly log is a separate file with one line per ISO week and a stable closeout_pointer column for capstone #11 audit.
Gate-by-gate facilitator notes (working dev depth)
J1 — schema and sprint_window latch
J1 prevents March receipts from colliding with February hourly or January pointer schemas in release-evidence/post-fest/.
jq -e '.schema == "march_post_fest_sprint_receipt_v1" and .sprint_window == "2027-03-post-fest-sprint"' "$REC"
J2 — February closeout pointer (the March-specific gate)
March weekly diff is meaningless without fest-end truth. Resolve pointer before computing row_diff:
CLO="$(jq -r '.february_closeout_pointer.path' "$REC")"
jq -e '.february_fest_closeout_ok == true and (.jsonl_annex | length >= 1)' "$CLO"
If jsonl_annex empty but february_fest_closeout_ok true, route empty annex recovery—do not waive J2 silently.
J3 — prior week continuity
W10 first week may document prior_week: null in notes. Later weeks must chain jsonl lines:
tail -n 1 release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl | jq -e '.iso_week'
J4 — evidence sprint prerequisite
Block weekly receipt when E7 incomplete:
jq -e '.march_post_fest_evidence_ok == true' BUILD_RECEIPT.json
J5 — row_diff honesty
Recompute with jq slurp; attach output to stand-up when MERGE or build_label rows change.
J6 — verify script + BUILD_RECEIPT latch
Mirror march_post_fest_sprint_weekly_ok only after verify_march_post_fest_sprint.sh exit 0.
Cluster integration table (March #1–#7)
| Cluster # | Receipt / artifact | Weekly snapshot key |
|---|---|---|
| #1 | Monday debrief facilitator | post_fest_debrief_card_ok |
| #3 | Velocity exports | wishlist_velocity_baseline_ok |
| #4 | Evidence sprint E7 | march_post_fest_evidence_ok |
| #5 | Empty annex recovery | annex_recovery_ok (if filed) |
| #6 | July October signup | october_fest_signup_ok (optional column) |
| #7 | Summer capsule gradient | summer_capsule_gradient_ok (optional) |
Weekly receipt indexes paths—it does not re-run E1–E7 nightly.
Beginner path — five-command weekly stand-up
# 1) Latest receipt exists
REC=release-evidence/post-fest/MARCH_SPRINT_RECEIPT_LATEST.json
test -f "$REC"
# 2) Verify gates
./scripts/verify_march_post_fest_sprint.sh "$REC"
# 3) Print build_label drift only
jq -r '.row_diff[] | select(.field=="build_label") | "\(.before) → \(.after)"' "$REC"
# 4) Confirm closeout pointer
jq -r '.february_closeout_pointer.path' "$REC" | xargs test -f
# 5) Append weekly log (facilitator)
jq -c '{iso_week, build_label, march_post_fest_sprint_weekly_ok, receipt_path: $rec, closeout_pointer: .february_closeout_pointer.path}' \
--arg rec "$REC" "$REC" >> release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl
Success check: Script prints march_post_fest_sprint verify: OK.
Exit code table (snippet-friendly)
| Exit | Meaning | Fix |
|---|---|---|
| 0 | J1–J6 pass | Weekly stand-up GREEN |
| 1 | Wrong schema | Fix march_post_fest_sprint_receipt_v1 |
| 2 | J2 closeout pointer fail | Sunday closeout or annex recovery |
| 3 | Missing prior week | Backfill jsonl or W10 waiver |
| 4 | march_post_fest_evidence_ok false |
Complete evidence sprint E7 |
| 5 | Empty or dishonest row_diff |
Recompute deltas |
| 6 | march_post_fest_sprint_weekly_ok false |
Complete verify prerequisites |
Worked example — synthesized 2027-W11
| Step | Action | Output |
|---|---|---|
| W11 Mon | Load closeout pointer | february_fest_closeout_ok: true, annex 4 paths |
| W11 Mon | Export BUILD_RECEIPT to now.json |
build_label: rc3-postfest-1 |
| W11 Mon | Load W10 from weekly jsonl | build_label: rc3 |
| W11 Mon | jq diff build_label | bump → forward #10 MERGE opinion check |
| W11 Mon | Verify march_post_fest_evidence_ok |
J4 pass |
| W11 Mon | Write receipt + verify | exit 0 |
| W11 Mon | Append jsonl | capstone trail updated |
Producer rule: Do not authorize post-fest branch merges until J2 closeout pointer GREEN—not verbal "fest went fine."
jq one-liners (copy-paste)
Diff BUILD_RECEIPT vs prior week export
jq -s '
.[1] as $now | .[0] as $prev |
($now.build_label) as $a | ($prev.build_label) as $b |
{field:"build_label", before:$b, after:$a, delta: (if $a==$b then "unchanged" else "bump" end)}
' prior_week.json now.json
Validate closeout pointer + annex non-empty
CLO="$(jq -r '.february_closeout_pointer.path' "$REC")"
jq -e '.february_fest_closeout_ok == true and (.jsonl_annex | length > 0)' "$CLO"
Flag MERGE column appearance in row_diff
jq -r '.row_diff[] | select(.field | test("merge")) | "MERGE column \(.field) \(.delta)"' "$REC"
Pair forward #10 MERGE exception opinion.
Weekly jsonl ISO week uniqueness
jq -s '[.[].iso_week] | length as $n | unique | length == $n' \
release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl
Crosswalk evidence + velocity booleans
jq -e '
.snapshot.march_post_fest_evidence_ok == true and
.snapshot.wishlist_velocity_baseline_ok == true
' "$REC"
Python cousin — recompute row_diff for J5 audit
# audit_march_sprint_diff.py
import json, sys
prev, now = json.load(open(sys.argv[1])), json.load(open(sys.argv[2]))
fields = ["build_label", "march_post_fest_evidence_ok", "merge_exception_list_ok"]
for f in fields:
b, a = prev.get(f), now.get(f)
delta = "unchanged" if b == a else ("new_column" if b is None else "bump")
print({"field": f, "before": b, "after": a, "delta": delta})
verify_march_post_fest_sprint.sh
#!/usr/bin/env bash
set -euo pipefail
REC="${1:-release-evidence/post-fest/MARCH_SPRINT_RECEIPT_LATEST.json}"
jq -e '.schema == "march_post_fest_sprint_receipt_v1"' "$REC" || exit 1
CLO="$(jq -r '.february_closeout_pointer.path' "$REC")"
test -f "$CLO" || exit 2
jq -e '.february_fest_closeout_ok == true' "$CLO" || exit 2
jq -e '.march_post_fest_sprint_weekly_ok == true' "$REC" || exit 6
jq -e '.row_diff | length >= 1' "$REC" || exit 5
jq -e '.row_diff[] | select(.field=="build_label")' "$REC" >/dev/null || exit 5
# J4 — evidence latch on BUILD_RECEIPT
jq -e '.march_post_fest_evidence_ok == true' BUILD_RECEIPT.json || exit 4
echo "march_post_fest_sprint verify: OK"
PowerShell verify cousin
$Rec = "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_LATEST.json"
$j = Get-Content $Rec -Raw | ConvertFrom-Json
if ($j.schema -ne "march_post_fest_sprint_receipt_v1") { exit 1 }
$clo = $j.february_closeout_pointer.path
if (-not (Test-Path $clo)) { exit 2 }
if (-not $j.march_post_fest_sprint_weekly_ok) { exit 6 }
Write-Host "march_post_fest_sprint verify: OK"
BUILD_RECEIPT wiring
{
"build_label": "fest-demo-2027-02-rc3-postfest-1",
"march_post_fest_evidence_ok": true,
"march_post_fest_sprint_weekly_ok": true,
"march_post_fest_sprint_receipt": "release-evidence/post-fest/MARCH_SPRINT_RECEIPT_LATEST.json",
"march_post_fest_sprint_weekly_log": "release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl",
"february_closeout_pointer": "release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json"
}
Latch order during March sprint:
- Sunday closeout GREEN with non-empty annex (or recovery filed).
- Evidence sprint E7 →
march_post_fest_evidence_ok. - Weekly march_post_fest_sprint receipt each ISO week.
- Forward #11 Friday capstone consumes full weekly jsonl.
CI weekly job sketch (GitHub Actions)
name: march-post-fest-sprint-weekly
on:
schedule:
- cron: "0 9 * * 1" # Mondays during March sprint window
jobs:
verify:
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v4
- name: verify latest weekly receipt
run: |
test -f release-evidence/post-fest/MARCH_SPRINT_RECEIPT_LATEST.json
bash scripts/verify_march_post_fest_sprint.sh release-evidence/post-fest/MARCH_SPRINT_RECEIPT_LATEST.json
Pin if: to March sprint dates—do not run weekly year-round on stale receipts.
Printable weekly facilitator card
Copy into release-evidence/post-fest/march-sprint-weekly-facilitator-card.md:
# March post-fest sprint — weekly jq stand-up (3 min)
iso_week: ______
closeout_pointer: release-evidence/february-live/FEBRUARY_FEST_CLOSEOUT_RECEIPT.json
[ ] J2 — closeout GREEN + jsonl_annex non-empty (or recovery filed)
[ ] J4 — march_post_fest_evidence_ok on BUILD_RECEIPT
[ ] build_label row_diff pasted to #post-fest-sprint
[ ] verify_march_post_fest_sprint.sh exit 0
[ ] jsonl line appended for this iso_week
[ ] MERGE bump? → forward #10 exception list
[ ] runway column new? → forward #9 cash worksheet
Laminate beside Thursday row review card—different cadence, same "receipt before narrative" discipline.
jsonl integrity checks (Friday capstone #11 prep)
Forward #11 Friday March capstone will consume the full weekly log before April content update authorization. Run before March ends:
# Expect 4 lines for a four-week sprint (± documented waivers)
wc -l release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl
# Unique iso_week stamps
jq -s '[.[].iso_week] | length as $n | unique | length == $n' \
release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl
# closeout_pointer stable across all weeks
jq -s '[.[].closeout_pointer] | unique | length == 1' \
release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl
# build_label tail — more than one label requires MERGE exception trail
jq -s '[.[].build_label] | unique' \
release-evidence/post-fest/march_post_fest_sprint_weekly_log.jsonl
If unique build_label count exceeds one without matching MERGE exception rows, pause April upload planning until forward #10 completes.
Partner diligence zip (weekly slice)
Attach one weekly receipt to partner threads—not the entire jsonl unless requested:
march-sprint-W11-weekly-proof.zip
├── march_post_fest_sprint_receipt_v1.json
├── FEBRUARY_FEST_CLOSEOUT_RECEIPT.json (pointer target excerpt path only in README)
├── row_diff_build_label.txt
└── verify_log.txt
Pointer-first email: "Weekly sprint diff filed W11; anchored to Sunday closeout annex count N; E7 evidence latch still true." Attach verify_log.txt exit 0 line for partners who run scripts locally.
February hourly vs March weekly comparison
| Dimension | February hourly | March weekly |
|---|---|---|
| Schema | february_fest_live_ops_receipt_v1 |
march_post_fest_sprint_receipt_v1 |
| Log density | ~168 lines / fest week | 4 lines / March sprint |
| Anchor | Prior hour | Prior week + closeout pointer |
| Unique gate | J3 HOTFIX label policy | J2 closeout pointer |
| Prereq | Live cluster evenings | E7 evidence sprint |
| Feeds | Sunday closeout jsonl | Friday March capstone #11 |
Proof table
| Evidence | Proves | Fail signal |
|---|---|---|
| Closeout pointer path | J2 fest-end truth | Weekly diff without anchor |
| Weekly jsonl line | J3 continuity | Skipped ISO weeks |
march_post_fest_evidence_ok |
J4 sprint start | Weekly before E7 |
row_diff[] |
J5 honest deltas | Hand-waved MERGE rows |
| verify script exit 0 | J6 latch | Verbal "sprint on track" |
| BUILD_RECEIPT mirror | Team discipline | Receipt without root row |
Scenarios A–G
| ID | Situation | Move |
|---|---|---|
| A | Standard W11 weekly | Full J1–J6 |
| B | Closeout annex empty | Recovery case study before J2 |
| C | E7 incomplete | Finish evidence sprint—no weekly until J4 |
| D | First week W10 | prior_week: null waiver in notes |
| E | build_label bump | Pair forward #10 MERGE exception list |
| F | Solo dev, no CI | Manual verify + jsonl append |
| G | October prep merges in March | Extra row_diff row for october_rc_label_ok optional column |
Facilitator weekly stand-up script (3 minutes)
1. Closeout pointer GREEN? (J2) — path + annex count
2. build_label row_diff — bump or unchanged?
3. march_post_fest_evidence_ok still true?
4. MERGE / runway columns — forward #9/#10 if new
5. verify_march_post_fest_sprint.sh exit 0 → append jsonl
Paste receipt path—not screenshots—in #post-fest-sprint.
Common mistakes
| Mistake | Fix |
|---|---|
| Copy February hourly jsonl schema | Use weekly log + closeout pointer |
| Skip closeout pointer | J2 mandatory |
| Weekly before E7 | J4 blocks |
| Thursday ritual only | Thursday ≠ post-fest sprint diff |
| Empty row_diff | J5 requires build_label row minimum |
| No jsonl append | Forward #11 loses trail |
Counterarguments (honest limits)
"Weekly Thursday review is enough."
Thursday diffs promotion columns; March sprint diffs post-fest engineering against closeout truth.
"jq is overkill for four March weeks."
Four lines in jsonl beat four weeks of "what did we merge?" Slack archaeology.
"Same gates as February hourly."
Same J1–J6 labels, different J2 semantics—closeout pointer vs HOTFIX policy.
Outbound references
- jq manual — slurpfile and diff patterns
- ISO week date formats —
iso_weekfield convention
Related GamineAI reads
- February hourly jq cousin
- Thursday row review
- Sunday February closeout
- 7-day March evidence sprint
- Monday debrief facilitator
- Empty annex recovery
- BUILD_RECEIPT beginner pipeline
- January reentry jq pointer
Key takeaways
- March 2027 post-fest sprint needs weekly jq—not February hourly jsonl.
february_closeout_pointeranchors weekly diff to Sunday closeout truth.march_post_fest_sprint_receipt_v1.jsonstoresrow_diff[]vs prior ISO week.- Gates J1–J6; J2 and J4 are March-specific blockers.
- Prereq:
march_post_fest_evidence_okfrom E7 evidence sprint. march_post_fest_sprint_weekly_log.jsonl— one line per week for capstone #11.- Thursday row review cousin—different columns, same ten-minute discipline spirit.
- Forward #9 March engineering cash runway when
engineering_runway_okappears in weekly snapshot. - Forward #10 MERGE opinion when
build_labelbump without exception list. verify_march_post_fest_sprint.shgives CI one exit code.- Guide #40 forward owns extended jq preflight cousin.
- Empty closeout annex → recovery case study before J2 waiver.
- Cluster #1–#7 indexed in weekly
snapshot—not re-run nightly.
FAQ
Is this the same as February hourly jq?
No—weekly cadence, march_post_fest_sprint_receipt_v1 schema, closeout pointer instead of HOTFIX J3.
Can we run weekly before evidence sprint E7?
No—J4 requires march_post_fest_evidence_ok.
How does Thursday row review relate?
Thursday owns promotion diff; this sketch owns post-fest sprint diff with closeout anchor.
What if closeout passed with empty annex?
Run empty annex recovery—J2 should not pass on hollow annex.
Does this replace Sunday closeout?
No—weekly receipts point at closeout; they do not recreate jsonl_annex[].
When does Friday capstone (#11) consume this log?
End of March—full march_post_fest_sprint_weekly_log.jsonl becomes capstone annex cousin.
Can we reuse February hourly jsonl paths in March?
No—different schema, cadence, and anchor. Copy scripts and discipline, not file paths or fest_window strings.
RED / YELLOW / GREEN routing (J gates)
| Signal | Route |
|---|---|
| J2 RED | Sunday closeout or annex recovery |
| J4 RED | Evidence sprint E7 |
| J5 RED | Recompute row_diff; pause MERGE comms |
| build_label bump | Forward #10 MERGE exception opinion |
| All GREEN | Append jsonl; update BUILD_RECEIPT |
Closing
March post-fest engineering without weekly jq becomes merge folklore—build_label bumps, velocity baselines, and MERGE exceptions drift from February closeout truth while October prep starts. File march_post_fest_sprint_receipt_v1.json with february_closeout_pointer, append march_post_fest_sprint_weekly_log.jsonl, and run verify_march_post_fest_sprint.sh each ISO week. Beginners use the weekly-vs-hourly table; working devs wire Monday CI; producers block merges until J2 GREEN. Forward #9 cash runway when contractor overtime columns appear in weekly snapshot, and forward #11 Friday capstone expects this trail—not a second hourly schema copied from live week.